AWWA CO50823 PDF

AWWA CO50823 PDF

Name:
AWWA CO50823 PDF

Published Date:
09/01/1999

Status:
Active

Description:

Securing an Adequate Long-Term Water Supply for Birmingham, AL

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
The objective of this report was to present the findings from an evaluation of past studies of the water resources of the Board and to present a conceptual framework for meeting future water needs of the Birmingham area for the next 50 years. A good water resource plan provides transmission capacity to deliver the source water to treatment facilities and raw water customers, adequate treatment capacity, a demand management plan, a drought water management plan, a water quality monitoring program, and a public participation program. The most important aspect of the water resource plan is that it is flexible. This dynamic program will be capable of responding to changes to the Board's system and changing customer needs. Includes tables, figure.
Edition : Vol. - No.
File Size : 1 file , 330 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 10
Published : 09/01/1999

History


Related products

AWWA CO50830
Published Date: 09/01/1999
Integrated Water Supply/Treatment Approaches
$7.2
AWWA CO50822
Published Date: 09/01/1999
Using Object-Oriented Models to Determine the Safe Yield of Water Supplies
$7.2
AWWA CO50849
Published Date: 09/01/1999
Geographic Information System (GIS) Assessment of Total Loads and Water Quality in the Corpus Christi Bay System
$7.2
AWWA CO50857
Published Date: 09/01/1999
Combining Groundwater Cleanup With Water Reclamation
$7.2

Best-Selling Products

ECMA 100
Published Date: 12/01/1988
Data Interchange on 90mm Flexible Disk Cartridges Using MFM Recording at 7 958 ftprad on 80 Tracks on Each Side-ISO Type 301, Second Edition
ECMA 102
Published Date: 07/01/1987
Rate Adaptation for the Support of Synchronous and Asynchronous Equipment Using the V. Series Type Interface on a PCSN, Second Edition
ECMA 106
Published Date: 12/01/1993
PTN - Signaling Protocol at the S Reference Point - Circuit Mode Basic Services (SSIG-BC), Third Edition
$5.4
ECMA 107
Published Date: 06/01/1995
Volume and File Structure of Disk Cartridges for Information Interchange, Second Edition
$5.4
ECMA 108
Published Date: 12/01/1996
Measurement of High-frequency Noise emitted by Information Technology and Telecommunications Equipment, Third Edition
$5.4
ECMA 109
Published Date: 12/01/1996
Declared Noise Emission Values of Information Technology and Telecommunications Equipment
$5.4