AWWA DPOC56510 PDF

AWWA DPOC56510 PDF

Name:
AWWA DPOC56510 PDF

Published Date:

Status:
Active

Description:

The IDSE: What is it and What Does it Mean to You?

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
The upcoming Stage 2 Disinfectants and Disinfection Byproducts Rule (DBPR) will require Community Water Systems (CWSs) to conduct an Initial Distribution System Evaluation (IDSE). The IDSE is intended to select new compliance monitoring sites within the water distribution system that more accurately reflect sites representing high TTHM and HAA5 levels than those sites currently used for compliance. They will be based either on system specific monitoring or other system specific data that provides equivalent or better information on site selection. Systems will recommend new or revised monitoring sites to their State/Primacy Agency based on their IDSE study. As utilities prepare for the Stage 2 DBPR, all options for conducting the IDSE should be considered. Utilities may conduct a Standard Monitoring Program as outlined in the IDSE guidance. This process involves sampling at several new distribution system monitoring locations in addition to current compliance monitoring locations every two months over the course of one year. In lieu of conducting a Standard Monitoring Program to identify distribution system locations with high DBP levels, the Rule also allows for System Specific Studies. In these studies, systems may perform an IDSE study based on other system specific monitoring or system specific data that will provide comparable or superior selection of new monitoring sites that target high DBP levels.
Edition : Vol. - No.
File Size : 1 file , 89 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 1

History


Related products

AWWA DPOC56495
Published Date:
Alley Water Main Relocation Program
$7.2
AWWA DPOC56496
Published Date:
Optimal Sampling Locations for Compliance with USEPA Stage 2D/DBPR
$7.2
AWWA DPOC56498
Published Date:
Overcoming Problems Associated with Switching from Free Chlorine to Chloramine Disinfection
$7.2
AWWA DPOC56501
Published Date:
Issue of Mixing the Free and Combined Chlorine Residuals in the Distribution System
$7.2

Best-Selling Products

FORD AWX
Published Date: 12/01/1993
WIRE, TAMPICO, AND SYNTHETIC FILAMENT POWER WHEEL BRUSHES APPLICATIONS AND GENERAL INFORMATION
$9
FORD B2BBX
Published Date: 09/01/1991
ONE-STEP PAINT LINE CLEANING PROCEDURE
$9
FORD B2F1
Published Date: 02/01/1978
ANODIC ELECTROCOATING SYSTEM CLEANING AND MAINTENANCE
$9
FORD B2GX
Published Date: 04/01/1984
PAINT BAKE OVENS CLEANING AND MAINTENANCE
$9
FORD BAX-1
Published Date: 07/01/1977
PAINT SPRAYING SYSTEMS, SMALL PARTS, AUTOMATIC
$9
FORD BAX-2
Published Date: 07/01/1985
PAINT SPRAY BOOTH BACK SECTION ACCEPTANCE TEST
$9