This slide presentation discusses chlorination/dechlorination procedures using Venturi/Orifice Designs. Topics covered include: operation of an Orifice design; pros and cons of Venturi and Orifice designs; Lateral By-pass Venturi design with mainline Orifice; modified continuous-feed method; determining the required amount of chlorine; cooking the line; alternate procedures; required equipment; chlorinating set-up; set-up discharge area; procedure for chlorinating the system; chlorination/dechlorination with Lateral By-pass Venturi; dechlorination chemicals; and, Ascorbic acid.
| Edition : | Vol. - No. |
| File Size : | 1
file
, 4.7 MB |
| Note : | This product is unavailable in Ukraine, Russia, Belarus |
| Number of Pages : | 51 |
| Published : | 10/01/2003 |