AWWA DSS69157 PDF

AWWA DSS69157 PDF

Name:
AWWA DSS69157 PDF

Published Date:
11/01/2008

Status:
Active

Description:

Central Feeder Pipeline Project

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
This powerpoint presentation begins by presenting study objectives that include the following: relieve areas of high groundwater; and, provide additional water supply to Metropolitan Water District of Southern California. The project required meeting the requirements of two important regional clients, San Bernardino Valley Municipal Water District and Metropolitan Water District of Southern California. The overall project was implemented in a phased approach to meet Metropolitan's growing demands, and several key issues were resolved during preliminary design related to project water supply, hydraulics, and facilities development. Final design and construction was divided into 4 tasks: Task 1 - Phase 1A Pipeline and Intertie Vaults; Task 2 - Phase 1B Pipeline; Task 3 - Pump Station Design; and, Task 4 - Pump Station Construction.
Edition : Vol. - No.
File Size : 1 file , 4.3 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 37
Published : 11/01/2008

History


Related products

AWWA DSS69159
Published Date: 11/01/2008
What We Have Here Is a Failure to Represent a Water Distribution System
$7.2
AWWA DSS69193
Published Date: 11/01/2008
Water Distribution Capital Planning in a High-Growth Region
$7.2
AWWA DSS69205
Published Date: 11/01/2008
Condition Assessment of the Union Street Water Transmission Main
$7.2
AWWA DSS69206
Published Date: 11/01/2008
Challenges of an Aging Water Distribution System: Staying Ahead of the Curve in Wilmington, Delaware
$7.2

Best-Selling Products