This powerpoint presentation begins by providing a brief overview of the Gwinnett County Department of Water Resources Energy Management and Operations (EM&O) Optimization Project, including optimization project drivers and initial feasibility study analysis. Detailed design of EM&O is presented, including:
system configuration and benefits;
HAZOP meetings and constraints;
hydraulic analysis;
feasibility study and savings review;
EMS software design specification; and,
SCADA / HMI interface and IT Design. The implementation plan and schedule is presented, along with a review of savings and return on investment. Includes tables, figures.
| Edition : | Vol. - No. |
| File Size : | 1
file
, 3 MB |
| Note : | This product is unavailable in Ukraine, Russia, Belarus |
| Number of Pages : | 48 |
| Published : | 11/01/2009 |