AWWA IMTECH51423 PDF

AWWA IMTECH51423 PDF

Name:
AWWA IMTECH51423 PDF

Published Date:
03/01/2000

Status:
Active

Description:

Implementing an Energy Management System for Distribution Pumping

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
The East Bay Municipal Utility District (EBMUD) provides water to over 1.2 million customers in the San Francisco/Oakland area of California. Water consumption averages 220 MGD and peaks at 325 MGD. As part of the water operation, EBMUD generates and sells an average of 135 GWh of hydroelectric energy each year that is produced at its two hydroelectric power plants. Driven by the accelerating need for an Energy Management System (EM) and the impending full deregulation of energy prices, EBMUD has embarked on the procurement and installation of a pilot EM system. EBMUD plans to have the EM system operational as a pilot for a portion of its water system in mid 2000. This paper discusses the main components of the EM system and its expected results. Includes 3 references, figures.
Edition : Vol. - No.
File Size : 1 file
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 11
Published : 03/01/2000

History


Related products

AWWA IMTECH51442
Published Date: 03/01/2000
The Benefits of Successfully Implementing an IT Master Plan
$7.2
AWWA IMTECH51435
Published Date: 03/01/2000
Designing, Developing & Implementing an Organizational Performance Management System
$7.2
AWWA IMTECH51420
Published Date: 03/01/2000
The New Deals for Network Modeling
$7.2
AWWA IMTECH51429
Published Date: 03/01/2000
Second Generation Intranet, the Organization's Competitive Edge
$7.2

Best-Selling Products