AWWA IMTECH54042 PDF

AWWA IMTECH54042 PDF

Name:
AWWA IMTECH54042 PDF

Published Date:
06/01/2001

Status:
Active

Description:

Automated Meter Reading Implementation for the City of San Antonio

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
The City of San Antonio, Texas, according to the Census Bureau, was the second fastest-growing city in the United States from 1990 to 1998. The demand for infrastructure hasincreased with the growth of the city. In order to do "more with less" the San AntonioWater System (SAWS) is continuously looking for ways to leverage new technologies to enable usto meet our growing demand for water in the San Antonio area. In doing this we mustcontinue to be sensitive to our customers' expectations for keeping costs to one of thelowest in the country, while providing superior water quality.The San Antonio area receives water from the Edwards Aquifer. Regional pumping of theaquifer already exceeds the aquifer's ability to sustain them along with natural springflows, downstream environmental needs, and user demands along the Guadalupe Riverduring a drought. Therefore, a recently passed state law is limiting the amount of waterSan Antonio can withdraw from the aquifer. The San Antonio Water System expects itsfinal permit from the Edwards Aquifer Authority to allow approximately 135,000 acre-feet per year under drought conditions. This contrasts with the 188,000 acre-feet thatSAWS actually pumped in 1999. Further, SAWS' permit may be reduced to about120,000 acre-feet in 2008 as part of an overall region-wide reduction in allowablepumping permits.Even with aggressive conservation to reduce per capita consumption, San Antonio'swater supply needs will double by 2050. In addition, San Antonio should have at least a10-year reserve supply over actual projected demand as protection against a drought. In1998, the SAWS Board recommended, and City Council adopted, a 50-year water supplyplan to meet these challenges. This plan was the final product of a long series ofplanning efforts, involving a succession of broad-based citizen committees over nearly adecade. This plan identifies the acquisition of outside water sources and projects relatedto the reduction of water use by our customers. These additional water sources haveincluded the design of an aquifer storage and recovery system, the purchasing ofadditional water rights from nearby areas, and the purchasing of surface water in differentparts of the region. We are also in the final stage of implementing our reuse waterprogram.These additional water supply requirements have necessitated a series of future rateincreases in coming years. Our adopted water plan and scheduled capital improvementplan is expected to cost in the neighborhood of $900,000,000 over the next five years.This has made other capital or M&O projects significantly more difficult to get funded.To combat this we have developed a financial analysis approach to show value beingadded to the system by implementing projects such as the automation of meter reading.This analysis approach has also helped in identifying expenditures that did not add valueto the system, such as smaller system acquisitions. This paper discusses the implementation of SAWS' automated meter reading program.
Edition : Vol. - No.
File Size : 1 file , 140 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 12
Published : 06/01/2001

History


Related products

AWWA IMTECH54046
Published Date: 06/01/2001
Optimal Reliability for Multi-Source Water Distribution Systems
$7.2
AWWA IMTECH54032
Published Date: 06/01/2001
Miami Valley River Index: Simplifying Water Quality Data for the Public
$7.2
AWWA IMTECH54035
Published Date: 06/01/2001
Application Service Providers (ASPs): What Are They, and How Do They Fit Into Your Overall IT Strategy?
$7.2
AWWA IMTECH54034
Published Date: 06/01/2001
Using Facility Automation and Information Management (FAIM) Technology to Save Labor Costs in the Water Treatment Industry: How Orlando Utilities Commission Saves $1,000,000 a Year
$7.2

Best-Selling Products

LPI 175
Published Date: 01/01/2008
Standard of Practice for the Design - Installation - Inspection of Lightning Protection Systems, 2008 Edition
LPI 175
Published Date: 2011
Standard of Practice for the Design - Installation - Inspection of Lightning Protection Systems, 2011 Edition
$14.7
LPI 175
Published Date: 2014
Standard of Practice for the Design - Installation - Inspection of Lightning Protection Systems, 2014 Edition
$14.7