AWWA IMTECH62886 PDF

AWWA IMTECH62886 PDF

Name:
AWWA IMTECH62886 PDF

Published Date:
03/01/2006

Status:
Active

Description:

Hydrant Repair and Replacement Model

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
The distribution system of the Portland Water Bureau includes about 15,000 hydrants. The authors considered costs and benefits of hydrant repair and replacement actions. An analysis was focused on supporting and addressing certain policy decisions ¿¿¿ whether it was cost effective to expand the hydrant overhaul program and potentially reduce repairs and replacements; what is the failure rate of hydrants and, consequently, what is a sustainable level of replacement that needs to be funded; what would be the future rate of hydrant failure under various repair and replacement strategies; and, whether it is cost effective to expand salvage part efforts.
Edition : Vol. - No.
File Size : 1 file , 180 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 5
Published : 03/01/2006

History


Related products

AWWA IMTECH62881
Published Date: 03/01/2006
Hennet Historian: Pathway to a New SCADA System
$7.2
AWWA IMTECH62896
Published Date: 03/01/2006
Las Vegas Valley Water District's Approach to Meet Initial Distribution System Evaluation Requirements
$7.2
AWWA IMTECH62897
Published Date: 03/01/2006
Proof-of-Concept: The Result
$7.2
AWWA IMTECH62900
Published Date: 03/01/2006
Application Services for Internet-Based Management of Drinking Water Quality and Operating Data
$7.2

Best-Selling Products