AWWA INF53978 PDF

AWWA INF53978 PDF

Name:
AWWA INF53978 PDF

Published Date:
06/01/2001

Status:
Active

Description:

Full-Scale Implementation of Cathodic Protection on Metallic Watermains

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
In 1996, the City of Winnipeg initiated a study to determinethe cost-effectiveness and practicability of external corrosion control formetallic water mains under Winnipeg conditions. The 1996 study concluded thatcathodic protection, and specifically the use of distributed sacrificial anodes,was a cost-effective solution for management of Winnipeg's metallic water mains.Subsequently, in 1998, the City of Winnipeg initiated a study to optimize designspecifications and construction procedures, and to develop a long-term strategyfor cathodic protection of metallic water mains. Two cathodic protection pilotprojects were initiated in summer of 1999 and successfully completed in the fallof the same year. Subsequent electrical monitoring in the spring of 2000 verifiedthat the installed systems were functioning as designed and achieving fullcathodic protection in accordance with NACE Recommended Practices. Ongoingmonitoring of the protected areas is being undertaken to track the electricalperformance of the system and its effectiveness on reducing leaks due to externalcorrosion. This paper discusses the methods, results and recommended follow-upprograms for long-term management of metallic water mains in Winnipeg. Includes 39 references, figures.
Edition : Vol. - No.
File Size : 1 file , 1.1 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 17
Published : 06/01/2001

History


Related products

AWWA INF54001
Published Date: 06/01/2001
Selecting an Infrastructure Management Software System
$7.2
AWWA INF53991
Published Date: 06/01/2001
San Francisco Water Department Reservoir Upgrade Program
$7.2
AWWA INF53990
Published Date: 06/01/2001
Design Build of Innovative Ultrafiltration Plant Meets Water Quality Demands and Delivery Schedule
$7.2
AWWA INF53982
Published Date: 06/01/2001
Horizontal Directional Drilling of Polyethylene Pipe
$7.2

Best-Selling Products