AWWA INF53989 PDF

AWWA INF53989 PDF

Name:
AWWA INF53989 PDF

Published Date:
06/01/2001

Status:
Active

Description:

Documentation of Large Infrastructure Construction Projects

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
Proper documentation of the construction process is an important facet of allconstruction projects because it provides the most reliable record of practices,events, and correspondence during construction. The more organized and extensivethe construction records are, the more useful the records are to the owner of thefacility. The San Diego County Water Authority (Authority) has developed anextensive construction documentation system using in-house quality controls,document control methods, and construction management software programs for usein implementing a $1.6 billion Capital Improvement Program. This paper containsinformation about various levels and types of documentation used duringconstruction and discusses the resulting benefits to the Authority. The benefitsdetailed include assurance of the quality of construction, prevention and defenseagainst contractor claims, and the historical reference for future projects. Includes figures.
Edition : Vol. - No.
File Size : 1 file , 680 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 16
Published : 06/01/2001

History


Related products

AWWA INF54002
Published Date: 06/01/2001
East Bay Municipal Utility District: Water System Operations and Technical Manual Project
$7.2
AWWA INF53991
Published Date: 06/01/2001
San Francisco Water Department Reservoir Upgrade Program
$7.2
AWWA INF53978
Published Date: 06/01/2001
Full-Scale Implementation of Cathodic Protection on Metallic Watermains
$7.2
AWWA INF53972
Published Date: 06/01/2001
Managing City of San Francisco's Water Distribution System With GIS
$7.2

Best-Selling Products