AWWA INF54003 PDF

AWWA INF54003 PDF

Name:
AWWA INF54003 PDF

Published Date:
06/01/2001

Status:
Active

Description:

PCCP Design Check Using AWWA-C304 in an Excel Spreadsheet

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
The manufacture of prestressed concrete cylinder pipe (PCCP) has been governed byAWWA C-301 for several decades. The pipe suppliers used either Method A or MethodB to help the design engineer and the owner design and specify PCCP pipe formajor water transmission and sewer force main projects. Numerous owners anddesign engineers began to question the validity of these over-simplified designcurves in the appendices of AWWA C-301, particularly when pipes intended to lastforever or for a long time were falling apart. The American Concrete PressurePipe Association (ACPPA) and its members responded to this criticism bydeveloping a pair of new standards, namely AWWA C301 and C304, to addressmaterial properties and design methodology. The design steps involved in C304 areso complicated that ACPPA had elaborate computer software developed to implementC304 for designers of this pipe. In most cases, the software was purchasedprimarily by the pipe manufacturers who belong to the ACPPA and either they wouldrun design analyses for interested parties or ACPPA would sell a copy of thesoftware for an enormous fee. The authors of this paper were experts on a numberof lawsuits involving PCCP failures and came across the above problems. As partof the discovery phases for the members in the legal profession, the authorsdeveloped a simple spreadsheet based on C304-92 to check the structural adequacyof PCCP lines designed to the old C301-72 to C301-84 design standards ratherefficiently. This paper provides an overview of this approach and a sampleapplication of this spreadsheet for specific PCCP projects to illustrate thepoint that an adequate design methodology does not necessarily have to becomplicated. Includes 4 references, tables.
Edition : Vol. - No.
File Size : 1 file , 270 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 10
Published : 06/01/2001

History


Related products

AWWA INF54002
Published Date: 06/01/2001
East Bay Municipal Utility District: Water System Operations and Technical Manual Project
$7.2
AWWA INF53990
Published Date: 06/01/2001
Design Build of Innovative Ultrafiltration Plant Meets Water Quality Demands and Delivery Schedule
$7.2
AWWA INF53983
Published Date: 06/01/2001
The Capabilities and Environmental Benefits of Pneumatic Pipe Bursting in Water Main and Service Line Replacement
$7.2
AWWA INF53980
Published Date: 06/01/2001
Future Outlook for Trenchless Rehabilitation Methods for Water Pipelines
$7.2

Best-Selling Products