AWWA INF55781 PDF

AWWA INF55781 PDF

Name:
AWWA INF55781 PDF

Published Date:
01/01/2002

Status:
Active

Description:

How to Achieve 50% More Capacity for Less Than 10% of the Cost

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
Elizabethtown Water Company (EWC) serves approximately one million people in Central New Jersey. In 1996, EWC completed construction of the Canal Road Water Treatment Plant (CRWTP). The CRWTP is a state of the art ozone treatment plant, which was originally rated for 40 MGD. The construction cost for the facility was $100 million. Based on demand projections through 2005, EWC determined that the rated and peaking capacity of the Canal Road Plant would have to be increased to 60 MGD and 72 MGD, respectively. This paper describes how EWC was able to work with its regulator, the New Jersey Department of Environmental Protection (NJDEP), and find a solution that increased the rated capacity of the CRWTP to 60 MGD, a 50% increase, for less than $7 Million. This project represents a strong argument for the use of supervisory control and data acquisition (SCADA) systems to operate and monitor water treatment processes. In this case, the historical record that SCADA provided allowed EWC to increase the rated capacity of the CRWTP by 50% without the addition of a $20 million flocculation/sedimentation basin.
Edition : Vol. - No.
File Size : 1 file , 120 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 8
Published : 01/01/2002

History


Related products

AWWA INF55793
Published Date: 01/01/2002
Construction Planning and Scheduling: Techniques for Motivating Contractors with Money
$7.2
AWWA INF55786
Published Date: 01/01/2002
Seismic Behavior of Pipe Joints
$7.2
AWWA INF55785
Published Date: 01/01/2002
Complex Water System Analysis Simplified Through the Use of Technology Erie County Water Authority Water Supply Study
$7.2
AWWA INF55784
Published Date: 01/01/2002
San Diego Water Assesses Pipeline Replacement Options Using GA Optimization
$7.2

Best-Selling Products

VDI VDE/VDI 2604
Published Date: 06/01/1971
Oberflaechen-Messverfahren; Rauheitsuntersuchung mittels Interferenzmikroskopie
$27
VDI VDI 02700 BLATT 13.1
Published Date: 05/01/2010
Ladungssicherung auf Strassenfahrzeugen - Grossraum- und Schwertransporte - Datenblatt zur Transportplanung von Grossraum- und Schwertransporten - Laengenberechnung
$9.3
VDI VDI 02700 BLATT 13.2
Published Date: 05/01/2010
Ladungssicherung auf Strassenfahrzeugen - Grossraum- und Schwertransporte - Datenblatt zur Transportplanung von Grossraum- und Schwertransporten - Winkelberechnung
$9.3
VDI VDI 03033
Published Date: 09/01/1995
Waermeuebertragungsanlagen - Musterformulare fuer ordnungsgemaesses Betreiben bzw. Dokumentieren
$16.8
VDI VDI 1000 BERICHTIGUNG
Published Date: 07/01/2020
VDI-Richtlinienarbeit - Grundsaetze und Anleitungen - Berichtigung zur Richtlinie VDI 1000:2017-02
$0.3
VDI VDI 1000
Published Date: 06/01/2010
VDI-Richtlinienarbeit - Grundsaetze und Anleitungen
$25.8