AWWA JAW19885 PDF

AWWA JAW19885 PDF

Name:
AWWA JAW19885 PDF

Published Date:
11/01/1986

Status:
Active

Description:

Journal AWWA - Evaluating Relative Stringencies of Existing and Proposed Microbiological MCLs

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$9
Need Help?
A mathematical model was used to calculate the effects of sample volume and number of samples collected each month on the probability of detecting coliforms in water distribution systems containing various levels of contamination and to compare proposed frequency-of-occurrence maximum contaminant level rules with existing microbiological rules. The number of samples examined appeared to have a profound effect on the stringency of a frequency-of-occurrence rule, with systems containing borderline levels of contamination more likely to meet the rule if only a few samples are collected each month. It was concluded that a frequency-of-occurrence rule with a coliform density limit of 1/100 mL, instead of the current 4/100 mL, would be much closer in stringency to the existing average-density rule. Includes 10 references, tables, figures.
Edition : Vol. 78 - No. 11
File Size : 1 file , 1.4 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 8
Published : 11/01/1986

History


Related products

AWWA JAW19880
Published Date: 11/01/1986
Journal AWWA - Water Systems Standards Survey
$9
AWWA JAW19881
Published Date: 11/01/1986
Journal AWWA - Restoring the Flow of a Finished Water Pipeline
$9
AWWA JAW19882
Published Date: 11/01/1986
Journal AWWA - Water Contamination Caused by Gasoline Permeating a Polybutylene Pipe
$9
AWWA JAW19883
Published Date: 11/01/1986
Journal AWWA - Water Contamination Caused by Gasoline Permeating a Polybutylene Pipe -- Discussion
$9

Best-Selling Products

CII BMM2001-10
Published Date:
Impacts of Design/Information Technology on Building and Industrial Projects
$36
CII BMM2002-10
Published Date: 11/01/2002
Measuring the Impacts of the Delivery System on Project Performance -- Design-Build and Design-Bid-Build
$36
CII BMM2002-3
Published Date: 02/01/2002
Benchmarking and Metrics Summary Report for 2001
$36
CII BMM2004-10
Published Date: 10/01/2004
Best Practices for Project Security
$36
CII BMM2006-10
Published Date: 07/01/2006
Lessons Learned in the Implementation of Best Practices for Project Security
$36
CII BMM2006-11
Published Date: 11/01/2006
Impacts of Automation and Integration Technologies on Project and Company Performance
$36