AWWA MTC69745 PDF

AWWA MTC69745 PDF

Name:
AWWA MTC69745 PDF

Published Date:
11/01/2009

Status:
Active

Description:

Development of Monitoring Tools to Improve Operational Stability on the Columbia Heights UF Plant

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
In 2005, the City of Minneapolis installed a 70 MGD ultrafiltration (UF) system at Columbia Heights, provided by GEIonics, and based on Norit membranes. The objective of this paper was to demonstrate the development of tools based on permeability measurement to assist operational personnel with the monitoring and assessment of their plant, and provide guidelines for decision making. At the design conditions used in commercial UF plants, fouling rates increase exponentially with flux. Selection of flux is therefore a finely balanced trade off between capital and operating cost, since an excessive flux will lead to high operational pressures and high chemical usage. Once a UF plant has been installed, permeability can be monitored to assess operational stability of the plant, and determine the effectiveness of the chemical wash procedures. However, permeability trends can provide an overwhelming level of data, especially for a multi-rack system. This paper provides a method of analyzing data to assist the monitoring process, and proposes the use of two simple indices. The Permeability Recovery Index (PRI) measures the fouling propensity of the feed and the extent of recovery of permeability from one Chemically Enhanced Backwash (CEB) to the next. PRI could indicate an ineffective CEB procedure, perhaps due to a mechanical failure such as a sticking valve, failed pump, or poor chemical distribution between racks. The Cleaning Effectiveness Index (CEI) measures the effectiveness of a series of CEBs, and would demonstrate the suitability of the chosen protocol. This indicates whether the CEB strategy has been effective over a period of time, and quantifies long term downward trends. CEI can be used to both assess the effectiveness of the CEB procedure and predict the need for a Clean In Place (CIP). The monitoring indices have been used together with absolute levels of permeability, to provide operational guidance, and ensure stable plant operation. Data is presented for a 2 year period to illustrate the use of the indices at Columbia Heights. The combination CEI and PRI monitoring indices can be used to define a trigger for action at two different levels. Includes 4 references, tables, figures.
Edition : Vol. - No.
File Size : 1 file , 1.5 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 12
Published : 11/01/2009

History


Related products

AWWA MTC69750
Published Date: 11/01/2009
Large Diameter RO and NF Membrane Elements: Commercialization and Use Update
$7.2
AWWA MTC69670
Published Date: 11/01/2009
A Tale of Two Facilities: The Story of Reclaiming and Reusing LPRO Concentrate at Ormond Beach
$7.2
AWWA MTC69770
Published Date: 11/01/2009
Identification of EfOM and NOM Fractions Responsible for Fouling in UF/MR
$7.2
AWWA MTC69727
Published Date: 11/01/2009
Breeches in Membrane Integrity-Practical Lessons on NF Pressure Vessel Probing
$7.2

Best-Selling Products

ASHRAE/IES 90.1-1999 Addendum a
Published Date:
Addendum a to ANSI/ASHRAE/IESNA Standard 90.1-1999
Free Download
ASHRAE/IES 90.1-1999 Addendum aa
Published Date:
Addendum aa to ANSI/ASHRAE/IESNA Standard 90.1-1999
Free Download
ASHRAE/IES 90.1-1999 Addendum ab
Published Date:
Addendum ab to ANSI/ASHRAE/IESNA Standard 90.1-1999
Free Download
ASHRAE/IES 90.1-1999 Addendum ac
Published Date:
Addendum ac to ANSI/ASHRAE/IESNA Standard 90.1-1999
Free Download
ASHRAE/IES 90.1-1999 Addendum ad
Published Date:
Addendum ad to ANSI/ASHRAE/IESNA Standard 90.1-1999
Free Download
ASHRAE/IES 90.1-1999 Addendum af
Published Date:
Addendum af to ANSI/ASHRAE/IESNA Standard 90.1-1999
Free Download