This slide presentation begins with an outline of the City of Phoenix, Arizona's
Large Water Main Assessment Program. It outlines the city of Phoenix's risk-managed approach to averting pre-stressed concrete cylinder pipe (PCCP) and covers topics that include: pipeline prioritization; elements of a risk assessment; likelihood factors of
installation date, waterway proximity and soil corrosivity; consequence factors of
pipeline diameter, adjacent land use, and proximity to railways and roadways; geographic information system (GIS)-Based Analysis; hydraulic modeling; Phoenix water model; demand, production, and evaluation of system impacts; and, PCCP Assessment Master Plan. Includes figures.
| Edition : | Vol. - No. |
| File Size : | 1
file
, 2.6 MB |
| Note : | This product is unavailable in Ukraine, Russia, Belarus |
| Number of Pages : | 28 |
| Published : | 03/01/2007 |