AWWA WQTC60681 PDF

AWWA WQTC60681 PDF

Name:
AWWA WQTC60681 PDF

Published Date:
11/15/2004

Status:
Active

Description:

Advanced Water Treatment Processes for the Control of Disinfection Byproducts in an Estuarine Water Downstream of the Source

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
awwa-wqtc60681_1208920

Choose Document Language:
7.20 €
Need Help?
Raw water sources for the Palmdale Water District (District) include State Project Water (SPW) and Littlerock Reservoir, which are treated at the Palmdale Water Treatment Plant (WTP), and also several groundwater wells. The District has struggled to comply with Stage 1 of the Disinfectants and Disinfection Byproducts Rule (D/DBPR), which includes stringent limits on chlorination byproducts, in particular total trihalomethanes (TTHMs) and five haloacetic acids (HAA-5). The main reasons for the elevated levels of TTHMs and HAA-5 are the nature and amount of natural organic matter (NOM) and the presence of significant concentrations of bromide in SPW. The District has taken steps to reduce disinfection byproduct (DBP) levels within the distribution system, such as increasing the use of groundwater (and decreasing the use of SPW) and increasing coagulant doses. Neither of these strategies is a sufficient long term solution. The District is performing a pilot study to evaluate combinations of processes to improve DBP control at the plant and to achieve compliance with the Stage 1 and 2 D/DBPRs. Process operating conditions, design criteria and, preliminary costs were developed in a previous desk-top level study, for MIEX®, granular activated carbon (GAC), fixed bed ion exchange (IX), and high-pressure membranes. That study formed the basis for selection of initial operating conditions for this pilot study. Process combination for THM precursor removal, included in the pilot study are: MIEX® (magnetically impregnated ion exchange resin) with enhanced coagulation and downstream GAC treatment; MIEX® in combination with a novel ceramic membrane; and, Fixed-bed IX with conventional treatment. GAC treatment was also investigated for removal of THMs formed in the upstream processes. Plant operations data indicates that bromide is largely incorporated into THMs within the treatment train. Adsorption of those THMs would mean that the GAC was essentially functioning as a bromide removal process. This paper presents preliminary results for the MIEX®/conventional treatment combination. Tentative conclusions are provided, based on an analysis of the pilot data collected to date, and the results of the previous desk-top study. Includes tables, figures.
Edition : Vol. - No.
File Size : 1 file
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 9
Published : 11/15/2004

History


Related products

AWWA WQTC60605
Published Date: 11/15/2004
Distribution System Modeling for Identifying the Potential for Low-Pressure Surge Events
7.20 €
AWWA WQTC60608
Published Date: 11/15/2004
Optimization of Preoxidant and Powdered Activated Carbon Addition
7.20 €
AWWA WQTC60619
Published Date: 11/15/2004
Effects of Alum Coagulation on Speciation and Distribution of Disinfection Byproducts
7.20 €
AWWA WQTC60665
Published Date: 11/15/2004
Geochemistry of Sulfur in Iron Corrosion Scales Found in Drinking Water Distribution Systems
7.20 €

Best-Selling Products

UNE-CEN/TS 1099:2009 EX
Published Date: 06/24/2009
Plywood - Biological durability - Guidance for the assessment of plywood for use in different use classes
UNE-CEN/TS 12169:2009 EX
Published Date: 10/28/2009
Criteria for the assessment of conformity of a lot of sawn timber
UNE-CEN/TS 12200-2:2004
Published Date: 11/12/2004
Plastics rainwater piping systems for above ground external use - Unplasticized poly(vinyl chloride) (PVC-U) - Part 2: Guidance for the assessment of conformity
UNE-CEN/TS 12201-7:2007 EX
Published Date: 05/23/2007
Plastics piping systems for water supply - Polyethylene (PE) - Part 7: Guidance for the assessment of conformity
UNE-CEN/TS 12390-9:2008 EX
Published Date: 05/07/2008
Testing hardened concrete - Part 9: Freeze-thaw resistance - Scaling
UNE-CEN/TS 13001-3-1:2006 EX
Published Date: 06/14/2006
Cranes - General design - Part 3-1: Limit states and proof of competence of steel structures