AWWA WQTC65708 PDF

AWWA WQTC65708 PDF

Name:
AWWA WQTC65708 PDF

Published Date:
11/01/2007

Status:
Active

Description:

Improving Hydraulic Mixing in a 90-year Old 10.5 MG Reservoir with I/O Redesign

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
The City of Oregon City's Mountain View Reservoir #2 is a 10.5 MG finished water reservoir. The facility was originally constructed in 1915 as an open 4.0 MG facility. The original facility design was a rectangular, concrete, in-ground reservoir with a single inlet/outlet (I/O) configuration at one corner of the reservoir. Operationally, the facility was originally designed in conjunction with a pumping station housing two pumps to fill and draw on the reservoir through the common 18-inch vertical, floor elevation I/O. In 1952, the reservoir was expanded, by adding reinforced concrete walls above-grade, to its present capacity of 10.5 MG. At that time an emergency auxiliary outlet and pump station with separate power generation was added to the reservoir for redundancy and reliability. The auxiliary outlet was designed at elevation that only allowed access to the newest 6.5 MG of storage. The original 4 MG was unavailable through the auxiliary outlet. Typical operation of the reservoir maintained water levels within three ft. range of the overflow. Due to the tight operational range freshwater brought into the tank during fill cycles was, at a maximum, only 14% of the total capacity. Field monitoring of the reservoir had not historically been conducted. However, CFD modeling of the original configuration of the reservoir showed that minimal mixing was occurring and hydraulically the reservoir was short-circuiting in a "last in, first out" manner. Structurally the facility did not meet current codes for seismic stability and in 2005 seismic improvements were planned. During design of seismic upgrades to the reservoir it was decided to rectify water quality problems resulting from the common I/O design, primarily loss of chlorine residual within the reservoir due to minimal mixing and hydraulic short-circuiting. To address the problem the City requested solutions for separating the common I/O to improve chlorine residual maintenance, mixing and reduction of short-circuiting and "dead zones." The I/O improvements separated the inlet and outlet by extending the existing auxiliary outlet to a 24-inch diameter inlet 240 ft. into the reservoir. A 90º degree elbow was installed and the inlet pipe extended down the slope and to the floor of the original 1915 reservoir. The new manifold was now located approximately 240 ft. from the outlet and 80 ft. from the back wall. The I/O improvements were combined with the replacement of the primary and auxiliary pumping stations with a single pump station. This provided the capability to maintain the existing common I/O intact and hydraulically convert it to function solely as the reservoir outlet. The reconfigured fixed directional inlet manifold was designed to distribute fill water across the reservoir horizontally while at the same time the lower elevation mixed the water vertically. To maximize the hydraulic momentum of the inlets, reducers were added to create discharge jets. The separation of the inlet and outlet provides the operational flexibility to operate the reservoir in a fill then draw mode, or in a continuous fill-draw mode. CFD modeling results of the relocated inlet and manifold designed to promote mixing show a more mixed condition in the reservoir. Actual field testing has not yet been conducted. Includes figures.
Edition : Vol. - No.
File Size : 1 file , 920 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 7
Published : 11/01/2007

History


Related products

AWWA WQTC65756
Published Date: 11/01/2007
Determining Critical Flux in Submerged Membrane Filtration of Han River Water
$7.2
AWWA WQTC65806
Published Date: 11/01/2007
The Effect of Phosphate on the Morphological and Spectroscopic Properties of Copper Drinking Water Pipes Experiencing Localized Corrosion
$7.2
AWWA WQTC65821
Published Date: 11/01/2007
Contamination Warning System Evaluation
$7.2
AWWA WQTC65699
Published Date: 11/01/2007
Identifying the Best Treatment Approach Using Focused Laboratory-Scale Testing
$7.2

Best-Selling Products

CAN/CSA-CEI/IEC 1000-1-1-97 (R2023)
Published Date: 01/18/2000
Electromagnetic Compatibility (EMC) - Part 1: General - Section 1: Application and Interpretation of Fundamental Definitions and Terms (Adopted CEI/IEC 1000-1-1:1992)
$37.8
CAN/CSA-CEI/IEC 1000-2-1-97 (R2023)
Published Date: 01/18/2000
Electromagnetic Compatibility (EMC) - Part 2: Environment - Section 1: Description of the Environment - Electromagnetic Environment for Low-Frequency Conducted Disturbances and Signalling in Public Power Supply Systems (Adopted CEI/IEC 1000- 2-1:1990) / Compatibilite electromagnetique (CEM) - Partie
$36.3
CAN/CSA-CEI/IEC 1160-96 (R2001)
Published Date: 05/03/2000
Formal Design Review (Adopted CEI/IEC 1160:1992) / Revue de conception formalisee (norme CEI/IEC 1160:1992 adoptee)
$31.5
CAN/CSA-CEI/IEC 1258-98 (R2002)
Published Date: 02/25/2000
Guidelines for the Development and Use of Medical Electrical Equipment Educational Materials (Adopted CEI/IEC 1258:1994, first edition) / Guide pour le developpement et l'utilisation des supports educatifs relatifs aux appareils electromedicaux (norme CEI/IEC 1258:1994 adoptee, premiere edition) **
CAN/CSA-CEI/IEC 1288-1-98 (R2012)
Published Date: 02/16/2000
Cardiac Defibrillators - Cardiac Defibrillators-Monitors - Part 1: Operation (Adopted CEI/IEC 1288-1:1993, first edition) / Defibrillateurs cardiaques - Moniteurs-defibrillateurs cardiaques - Partie 1: Fonctionnement (norme CEI/IEC 1288-1:1993 adoptee, premiere edition)
CAN/CSA-CEI/IEC 1288-2-98 (R2012)
Published Date: 02/16/2000
Cardiac Defibrillators - Cardiac Defibrillators-Monitors - Part 2: Maintenance (Adopted CEI/IEC 1288-2:1993, first edition) / Defibrillateurs cardiaques - Moniteurs-defibrillateurs cardiaques - Partie 2: Maintenance (norme CEI/IEC 1288-2:1993 adoptee, premiere edition)