Recommended Practice 90, Annular Casing Pressure Management for Offshore Wells, First Edition
Document status: Active
Management Practices, Self-Assessment Process, and Resource Materials
Document status: Active
Prevention of Brittle Fracture of Pressure Vessels - WITHDRAWN, No replacement
Document status: [ Withdrawn ]
Managed Pressure Drilling Operations— Controlled Mud Level with a Subsea Blowout Preventer, First Edition
Document status: Active
Addendum 1 to Managed Pressure Drilling Operations with Surface Back-pressure, First Edition
Document status: Active
Errata 1 to Managed Pressure Drilling Operations with Surface Back-pressure, First Edition, Includes Errata (2017)
Document status: Active
Errata 2 to Managed Pressure Drilling Operations with Surface Back-pressure, First Edition
Document status: Active
Managed Pressure Drilling Operations with Surface Back-pressure, First Edition, Includes Errata 1 (2017), Errata 2 (2023), and Addendum 1 (2023)
Document status: Active
Managed Pressure Drilling Operations - Pressurized Mud Cap Drilling with a Subsea Blowout Preventer, First Edition
Document status: Active
Addendum 1 to Managed Pressure Drilling Operations - Surface Back-pressure with a Subsea Blowout Preventer, First Edition
Document status: Active