Managed Pressure Drilling Operations - Surface Back-pressure with a Subsea Blowout Preventer, First Edition, Includes Addendum 1 (2023)
Document status: Active
Underbalanced Drilling Operations, First Edition
Document status: Active
Errata for Design, Materials, Fabrication, Operation, and Inspection Guidelines for Corrosion Control in Hydroprocessing Reactor Effluent Air Cooler (REAC) Systems, Second Edition
Document status: Active
Design, Materials, Fabrication, Operation, and Inspection Guidelines for Corrosion Control in Hydroprocessing Reactor Effluent Air Cooler (REAC) Systems, Second Edition, Includes Errata (2014)
Document status: Active
Design, Materials, Fabrication, Operation, and Inspection Guidelines for Corrosion Control in Hydroprocessing Reactor Effluent Air Cooler (REAC) Systems, Third Edition
Document status: Active
Addendum 1 to Materials and Fabrication of 2 1/4Cr-1Mo, 2 1/4Cr-1Mo-1/4V, 3Cr-1Mo, and 3Cr-1Mo-1/4V Steel Heavy Wall Pressure Vessels for High-temperature, High-pressure Hydrogen Service, Second Edition
Document status: Active
Addendum 1 to Materials and Fabrication of 2 1/4Cr-1Mo, 2 1/4Cr-1Mo-1/4V, 3Cr-1Mo, and 3Cr-1Mo-1/4V Steel Heavy Wall Pressure Vessels for High-temperature, High-pressure Hydrogen Service, Second Edition
Document status: Active
Errata for Materials and Fabrication of 2-1/4Cr-1Mo, 2 1/4Cr-1Mo-1/4V, 3Cr-1Mo, and 3Cr-1Mo-1/4V Steel Heavy Wall Pressure Vessels for High-temperature, High Pressure Hydrogen Service, Third Edition
Document status: Active
Materials and Fabrication of 2-1/4Cr-1Mo, 2 1/4Cr-1Mo-1/4V, 3Cr-1Mo, and 3Cr-1Mo-1/4V Steel Heavy Wall Pressure Vessels for High-temperature, High Pressure Hydrogen Service
Document status: Active
Materials and Fabrication of 2-1/4Cr-1Mo, 2 1/4Cr-1Mo-1/4V, 3Cr-1Mo, and 3Cr-1Mo-1/4V Steel Heavy Wall Pressure Vessels for High-temperature, High Pressure Hydrogen Service, Third Edition, Includes Errata (2021)
Document status: Active