Living With the Lowest Bidder - The Solution May be Partnering
Document status: Active
The Detroit Experience: An Innovative Strategy for Design/Build/Maintain Contract Procurement
Document status: Active
Optimizing Fast-Track Facility Delivery Through Owner-Guided Design/Build
Document status: Active
Collaborative Approach to Integrating Design, Construction and O&M Expertise to Reduce Construction and Life-Cycle Costs
Document status: Active
Building and Managing an Effective Construction Project Web Site
Document status: Active
Getting the Equipment the Owner (Not the Contractor) Wants at a Competitive Price: Pre-bidding Emerging Technologies
Document status: Active
Construction and Startup of a 20-mgd Carbonic Acid Air Stripping Process for Hydrogen Sulfide Removal
Document status: Active
Expanding the Ozonation Facilities at the Eagle Mountain Water Treatment Plant
Document status: Active
Enhanced Cold Lime Softening Treatment Strategies for Disinfection By-Product Compliance
Document status: Active
Use of CO2 for Enhanced Coagulation: Experience in Design, Construction, and Operation at City of Chandler
Document status: Active