S&C System Specification for the Design of Switches & Crossings (aka NR/L2/TRK/0070)
Document status: [ Active ]
Lighting Requirements for Visual Track Inspection
Document status: [ Active ]
Inspection and Maintenance Procedures for Crossings in Track: Inspections of Crossings in Track
Document status: [ Active ]
Inspection and Maintenance Procedures for Crossings in Track: Crossing Defects and Minimum Action Tables
Document status: [ Active ]
Inspection, Maintenance and Repair Procedures for Cast, Welded and Fabricated Crossings in the Track
Document status: [ Revised ]
Inspection and Maintenance Procedures for Crossings in Track
Document status: [ Active ]
Management of Rail Testing Using Train Based Sperry-Equipped Ultrasonic Test Unit (Sperry UTU)
Document status: [ Revised ]
Management of Rail Testing Using Train Based Sperry-Equipped Ultrasonic Test Unit (Sperry UTU)
Document status: [ Inactive ]
Briefing Materials for NR/L2/TRK/2102 Issue 8: Design and Construction of Track - Summary and Details of Changes and Further Explanation Behind Changes
Document status: [ Withdrawn ]