DID DI-SESS-82303 PDF

DID DI-SESS-82303 PDF

Name:
DID DI-SESS-82303 PDF

Published Date:
10/15/2019

Status:
Active

Description:

PHASE-IN PLAN

Publisher:
Data Item Description

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$3.6
Need Help?

File Size : 1 file , 120 KB
Number of Pages : 1
Published : 10/15/2019

History


Related products

DID DI-ILSS-80336A
Published Date: 09/09/1992
REAL-TIME OUTFITTING MANAGEMENT INFORMATION SYSTEM (ROMIS) DATA BASE (RDB) TOTAL SHIP CONFIGURATION TO DATE (SUPERSEDING DI-ILSS-80336)
$7.2
DID DI-ILSS-80635
Published Date: 06/29/1988
SEALIFT REQUIREMENTS FORECAST (CARGO CONSIST)
$7.2
DID DI-PSSS-80955A
Published Date: 10/10/2019
GOVERNMENT FURNISHED (GF) RESIDUAL ASSET FILE
$3.6
DID DI-SESS-82166
Published Date: 11/09/2017
Engineering Data Package
$3.6

Best-Selling Products

HIR FTV RP 2007
Published Date: 03/01/2018
In-service Inspection of Aboveground Atmospheric Fiberglass Reinforced Plastic Tanks and Vessels
$69
HIR FTV RP 2007
Published Date: 01/03/2023
In-service Inspection of Aboveground Atmospheric Fiberglass Reinforced Plastic Tanks and Vessels, Recommended Practice 2007(c)
$79.5
HIR Publication 2023
Published Date: 12/31/2023
A publication providing insights into the methods used to repair small, existing, shop-fabricated steel Above-ground, Atmospheric Pressure, Vented, Tanks designed and used for Petroleum and Non- Petroleum storage
$47.7