DNV DNV-RP-G105 PDF

DNV DNV-RP-G105 PDF

Name:
DNV DNV-RP-G105 PDF

Published Date:
09/01/2019

Status:
[ Active ]

Description:

Development and operation of liquefied natural gas bunkering facilities

Publisher:
DNV

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$43.5
Need Help?

Scope and limitations of this recommended practice

Figure 1-1 shows the typical project lifecycle process of an LNG bunkering facility. The scope of this RP stretches across the activities, from the strategy phase through to the operation of an LNG bunkering facility.

The main topics covered by this RP are as follows:

— Development of LNG bunkering facilities (Sec.4)

— Risk assessments for LNG bunkering facilities (Sec.4 and Sec.6 and App.D)

— Safety management system (SMS) requirements (Sec.5)

— Operation of LNG bunkering facilities (Sec.6)

— Determination of the quantity and properties of the supplied LNG (Sec.7)

Figure 1-2 illustrates the different types of bunkering operations covered by the scope. The bunkering scenarios directly covered by this RP are: terminal-to-ship, truck-to-ship and ship-to-ship transfers. The practices presented may, with special considerations, also be used for other bunkering scenarios, like the use of portable tanks referred to as “cassette bunkering”. The RP is applicable to vessels covered by the IMO regulations as well as inland shipping.

Regarding simultaneous operations on land and sea (e.g. cargo handling, passenger operations, ship traffic close to the bunkering location, etc.), the RP addresses the risk management requirements and discusses the methodologies available.

The following are excluded from the scope of this RP:

— Installations, arrangements and operations on the receiving vessel other than those related to LNG bunkering.

— The development of intermediate storage facilities and any activity upstream from intermediate storage, in the value chain.

— The recycling or dismantling of an LNG bunkering facility at the end of its lifecycle.


Edition : 19
File Size : 1 file , 3.6 MB
Number of Pages : 86
Published : 09/01/2019

History

DNV DNV-RP-G105
Published Date: 09/01/2019
Development and operation of liquefied natural gas bunkering facilities
$43.5
DNV DNVGL-RP-G105
Published Date: 09/01/2019
Development and operation of liquefied natural gas bunkering facilities
$43.5
DNV DNVGL-RP-G105
Published Date: 10/01/2015
Development and operation of liquefied natural gas bunkering facilities
$43.5

Related products

DNV DNV-RU-SHIPS PART 5 CHAPTER 2
Published Date: 07/01/2016
NEW BUILDINGS SPECIAL SERVICE AND TYPE – ADDITIONAL CLASS Passenger and dry cargo ships
$17.1
DNV DNV-RU-SHIPS/HSLC PART 2 CHAPTER 2
Published Date: 01/01/2016
NEWBUILDINGS MATERIALS AND WELDING - Metallic Materials
$17.1
DNV DNV-RP-E302
Published Date: 04/01/2017
Design and installation of plate anchors in clay
$43.5
DNV DNV-RP-F202
Published Date: 10/01/2010
COMPOSITE RISERS
$17.1

Best-Selling Products

prNS 2964
Published Date: 10/24/2000
Plastics pipes - Pipes and fittings with structured wall of polyethylene (PE) for underground non-pressure systems for drainage and sewerage
prNS 2965
Published Date: 10/24/2000
Plastics pipes - Pipes and fittings with structured wall of polypropylene (PP) for underground non-pressure systems for drainage and sewerage
prNS 2966
Published Date: 10/24/2000
Plastics pipes - Pipes and fittings with structured wall of unplasticised poly(vinyl chloride) (PVC-U) for underground non-pressure systems for drainage and sewerage
prNS 2967
Published Date: 06/01/2001
Cable ducts of plastics with smooth solid wall pipe
prNS 2970
Published Date: 09/06/2004
Solid Wall cable ducting of thermoplastics for embedding
prNS 3563
Published Date: 07/01/2002
Ventilation for buildings - Design methodes for indoor climate