DNV DNV-RU-SHIPS PART 3 CHAPTER 8 PDF

DNV DNV-RU-SHIPS PART 3 CHAPTER 8 PDF

Name:
DNV DNV-RU-SHIPS PART 3 CHAPTER 8 PDF

Published Date:
07/01/2021

Status:
[ Revised ]

Description:

Part 3 Hull - Chapter 8 Buckling

Publisher:
DNV

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
dnv-dnv-ru-ships-part-3-chapter-8_2826087

Choose Document Language:
17.10
Need Help?

The buckling checks shall be performed according to:

— Sec.2 for the slenderness requirements of plates, longitudinal and transverse stiffeners, primary supporting members and brackets

— Sec.3 for the hull girder buckling requirements of plates, longitudinal and transverse stiffeners, supporting members and other structures

— Sec.4 for the buckling requirements of the direct analysis for the plates, stiffened panels and other structures. Buckling analysis according to Sec.4 is also applicable for beam analysis of structure elements subjected to compressive and shear stresses

— the Society's document DNV-CG-0128 Buckling, for the buckling capacity.

Stiffener

The buckling check of the stiffeners referred to in this chapter is applicable to the stiffener fitted parallel to the long edge of the plate panel.

Platforms for permanent means of access

Platforms for permanent means of access (PMA) inclusive enlarged stiffeners, shall be considered as primary support members (PSM) and shall comply with the following requirements:

— slenderness requirement for PSM as given in Sec.2 [4]

— buckling strength of web plate as given in Sec.3 [3] and Sec.4 [2]

— buckling strength of web stiffener as given in Sec.3 [3] and Sec.4 [2], when a web stiffener is fitted

— tripping bracket requirement for PSM as given in Sec.2 [5], unless buckling strength for stiffeners as given in Sec.3 [3] and Sec.4 [2] are complied with. For PMA platforms with web stiffening the buckling capacity of flange may be assessed according to DNV-CG-0128 Sec.3 [4].


Edition : 21#
File Size : 1 file , 1.4 MB
Number of Pages : 44
Published : 07/01/2021

History

DNV DNV-RU-SHIPS PART 3 CHAPTER 8
Published Date: 07/01/2024
Part 3 Hull - Chapter 8 Buckling
17.10 €
DNV DNV-RU-SHIPS PART 3 CHAPTER 8
Published Date: 07/01/2021
Part 3 Hull - Chapter 8 Buckling
17.10 €
DNV DNV-RU-SHIPS PART 3 CHAPTER 8
Published Date: 07/01/2021
Part 3 Hull - Chapter 8 Buckling
17.10 €
DNV DNVGL-RU-SHIPS PART 3 CHAPTER 8
Published Date: 07/01/2020
Part 3 Hull - Chapter 8 Buckling
17.10 €
DNV DNVGL-RU-SHIPS PART 3 CHAPTER 8
Published Date: 07/01/2019
Part 3 Hull - Chapter 8 Buckling
17.10 €
DNV DNVGL-RU-SHIPS PART 3 CHAPTER 8
Published Date: 07/01/2018
Part 3 Hull - Chapter 8 Buckling
17.10 €
DNV DNVGL-RU-SHIPS PART 3 CHAPTER 8
Published Date: 01/01/2018
Part 3 Hull - Chapter 8 Buckling
17.10 €
DNV DNVGL-RU-SHIPS PART 3 CHAPTER 8
Published Date: 01/01/2017
Part 3 Hull - Chapter 8 Buckling
17.10 €
DNV DNVGL-RU-SHIPS PART 3 CHAPTER 8
Published Date: 07/01/2016
Part 3 Hull - Chapter 8 Buckling
17.10 €
DNV DNVGL-RU-SHIPS PART 3 CHAPTER 8
Published Date: 10/01/2015
Part 3 Hull - Chapter 8 Buckling
17.10 €
DNV DNVGL-RU-SHIPS PART 3 CHAPTER 8
Published Date: 10/01/2015
Part 3 Hull - Chapter 8 Buckling
17.10 €

Related products

DNV DNV TAP NO. 843.20-MED A.1/4.6
Published Date: 04/01/2009
ECHO SOUNDING EQUIPMENT
17.10 €
DNV DNV APPROVAL OF MANUFACTURERS NO. 330
Published Date: 06/01/2004
BOILERS AND PRESSURE VESSELS
17.10 €
DNV DNV-RU-SHIPS PART 6 CHAPTER 3
Published Date: 07/01/2011
NEWBUILDINGS SPECIAL EQUIPMENT AND SYSTEMS - ADDITIONAL CLASS - Periodically Unattended Machinery Space
17.10 €
DNV DNV-RU-SHIPS PART 6 CHAPTER 1
Published Date: 07/01/2024
Part 6 Additional class notations - Chapter 1 Structural strength and integrity
17.10 €

Best-Selling Products

UOP 1-87
Published Date: 01/01/1987
Distillation Range of Heavy Petroleum Oils and Determination of Coke Residue
86.10 €
UOP 1000-12
Published Date: 11/01/2012
Smoke Point Determination of Kerosene and Aviation Turbine Fuel Using an Automated Method
86.10 €
UOP 1000-13
Published Date: 03/01/2013
Smoke Point Determination of Kerosene and Aviation Turbine Fuel Using an Automated Method
72.00 €
UOP 1001-14
Published Date: 08/21/2014
Chloride and Fluoride in Liquefied Petroleum Gases (LPG) by Combustion Ion Chromatography (CIC)
72.00 €
UOP 1003-13
Published Date: 09/01/2013
Trace Metals in Methanol by ICP-OES
72.00 €
UOP 1005-14
Published Date: 03/01/2014
Trace Metals in Organics by ICP-MS
72.00 €