DNV DNVGL-RU-SHIPS PART 3 CHAPTER 8 PDF

DNV DNVGL-RU-SHIPS PART 3 CHAPTER 8 PDF

Name:
DNV DNVGL-RU-SHIPS PART 3 CHAPTER 8 PDF

Published Date:
07/01/2019

Status:
[ Revised ]

Description:

Part 3 Hull - Chapter 8 Buckling

Publisher:
DNV

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$17.1
Need Help?

The buckling checks shall be performed according to:

— Sec.2 for the slenderness requirements of plates, longitudinal and transverse stiffeners, primary supporting members and brackets

— Sec.3 for the hull girder buckling requirements of plates, longitudinal and transverse stiffeners, supporting members and other structures

— Sec.4 for the buckling requirements of the direct analysis for the plates, stiffened panels and other structures. Buckling analysis according to Sec.4 is also applicable for beam analysis of structure elements subjected to compressive and shear stresses

— the Society's document DNVGL-CG-0128 Buckling, for the buckling capacity.

Stiffener

The buckling check of the stiffeners referred to in this chapter is applicable to the stiffener fitted parallel to the long edge of the plate panel.

Platforms for permanent means of access

Platforms for permanent means of access (PMA) inclusive enlarged stiffeners, shall be considered as primary support members (PSM) and shall comply with the following requirements:

— slenderness requirement for PSM as given in Sec.2 [4]

— buckling strength of web plate as given in Sec.3 [3] and Sec.4 [2].

— buckling strength of web stiffener as given in Sec.3 [3] and Sec.4 [2], when a web stiffener is fitted

— tripping bracket requirement for PSM as given in Sec.2 [5], unless buckling strength for stiffeners as given in Sec.3 [3] and Sec.4 [2] are complied with. For PMA platforms with web stiffening the buckling capacity of flange may be assessed according to DNVGL-CG-0128 Sec.3 [4].


Edition : 19
File Size : 1 file , 550 KB
Number of Pages : 40
Published : 07/01/2019

History

DNV DNV-RU-SHIPS PART 3 CHAPTER 8
Published Date: 07/01/2024
Part 3 Hull - Chapter 8 Buckling
$17.1
DNV DNV-RU-SHIPS PART 3 CHAPTER 8
Published Date: 07/01/2021
Part 3 Hull - Chapter 8 Buckling
$17.1
DNV DNV-RU-SHIPS PART 3 CHAPTER 8
Published Date: 07/01/2021
Part 3 Hull - Chapter 8 Buckling
$17.1
DNV DNVGL-RU-SHIPS PART 3 CHAPTER 8
Published Date: 07/01/2020
Part 3 Hull - Chapter 8 Buckling
$17.1
DNV DNVGL-RU-SHIPS PART 3 CHAPTER 8
Published Date: 07/01/2019
Part 3 Hull - Chapter 8 Buckling
$17.1
DNV DNVGL-RU-SHIPS PART 3 CHAPTER 8
Published Date: 07/01/2018
Part 3 Hull - Chapter 8 Buckling
$17.1
DNV DNVGL-RU-SHIPS PART 3 CHAPTER 8
Published Date: 01/01/2018
Part 3 Hull - Chapter 8 Buckling
$17.1
DNV DNVGL-RU-SHIPS PART 3 CHAPTER 8
Published Date: 01/01/2017
Part 3 Hull - Chapter 8 Buckling
$17.1
DNV DNVGL-RU-SHIPS PART 3 CHAPTER 8
Published Date: 07/01/2016
Part 3 Hull - Chapter 8 Buckling
$17.1
DNV DNVGL-RU-SHIPS PART 3 CHAPTER 8
Published Date: 10/01/2015
Part 3 Hull - Chapter 8 Buckling
$17.1
DNV DNVGL-RU-SHIPS PART 3 CHAPTER 8
Published Date: 10/01/2015
Part 3 Hull - Chapter 8 Buckling
$17.1

Related products

DNV DNV-OS-D202
Published Date: 07/01/2023
Automation, safety and telecommunication systems
$17.1
DNV DNV-RU-SHIPS/HSLC PART 2 CHAPTER 2
Published Date: 01/01/2016
NEWBUILDINGS MATERIALS AND WELDING - Metallic Materials
$17.1
DNV DNV-CP-0148
Published Date: 09/01/2021
Couplings used for torque transmission in propulsion or auxiliary plants
$17.1
DNV DNV TAP NO. 844.80-MED A.1/4.16
Published Date: 02/01/2012
Heading Control System (HCS)
$17.1

Best-Selling Products