DNV DNVGL-ST-E407 PDF

DNV DNVGL-ST-E407 PDF

Name:
DNV DNVGL-ST-E407 PDF

Published Date:
09/01/2019

Status:
[ Revised ]

Description:

Rope based deployment and recovery systems for designated service

Publisher:
DNV

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$43.5
Need Help?
W/D S/S BY DNV-ST-E407 * NO LONGER AVAILABLE

This standard covers rope based deployment and recovery systems that are integrated by defining the adequate acceptance criteria for delivery and the adequate designated service limits:

— The deployment and recovery system shall meet the acceptance criteria at hand-over.

— The use of the deployment and recovery system shall not exceed the designated service limits.

It addresses the reliable performance of integrated deployment and recovery systems that are mounted on a vessel or a floating unit with the main purpose of placing or removing objects underwater.

Conventional and innovative solutions are treated equally by this standard because of the required assurance of functions.

The documentation shall be presented as an assurance case for the reliability of the integrated deployment and recovery system when in use. The documentation requirements cover the system integration and the component systems with their engineering dimensioning, materials, and methods of manufacture and testing; all of which shall be verified with respect to the designated service.

This standard can also be used for integrated deployment and recovery systems that operate in air or from a fixed platform.

This standard does not cover equipment or devices in the lifted mass, or the subsea tool. However, lifted mass, suspended mass, added mass and drag will influence system response and will have to be considered in order to derive load cases.

Guidance note:

The subsea tool and connection elements should be managed with the same goal of assuring reliability and associated safety as inferred from this standard.


Edition : 19
File Size : 1 file , 700 KB
Number of Pages : 56
Published : 09/01/2019

History

DNV DNV-ST-E407
Published Date: 09/01/2019
Rope based deployment and recovery systems for designated service
$43.5
DNV DNVGL-ST-E407
Published Date: 09/01/2019
Rope based deployment and recovery systems for designated service
$43.5
DNV DNVGL-ST-E407
Published Date: 03/01/2016
Rope based deployment and recovery systems for designated service
$43.5
DNV DNVGL-ST-E407
Published Date: 03/01/2016
Rope based deployment and recovery systems for designated service
$43.5

Related products

DNV DNV-RU-UWT PART 1 CHAPTER 1
Published Date: 07/01/2024
Part 1 General regulations - Chapter 1 General regulations
$17.1
DNV DNV-OS-E402
Published Date: 07/01/2024
Diving systems
$17.1
DNV DNV-RU-SHIPS PART 4 CHAPTER 4
Published Date: 07/01/2016
NEWBUILDINGS MACHINERY AND SYSTEMS - MAIN CLASS - Rotating Machinery, Power Transmission
$17.1
DNV DNV-RU-SHIPS PART 4 CHAPTER 2
Published Date: 07/01/2021
Part 4 Systems and components - Chapter 2 Rotating machinery, general
$17.1

Best-Selling Products