GMW GMW16552 PDF

GMW GMW16552 PDF

Name:
GMW GMW16552 PDF

Published Date:
01/01/2018

Status:
[ Revised ]

Description:

Semiconductor Change Process Specification

Publisher:
General Motors Worldwide

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
gmw-gmw16552_2621865

Choose Document Language:
23.40 €
Need Help?
ENGLISH HISTORICAL VERSION

Introduction

Note: Nothing in this standard supercedes applicable laws and regulations.

Note: In the event of conflict between the English and domestic language, the English language shall take precedence.

Purpose. This standard defines the GM Supplier Hardware Change Management Process for Semiconductor Part Changes. This process is the means by which the Electrical Component/Subsystem Supplier shall propose changes directly to GM, or to GM and GMʹs Integration Supplier when there is an Integration Supplier, due to Unexpected Part Shortages, part ʺend of lifeʺ, part modifications, etc. This process does not apply to changes, made due to a change request from GM, that affect functions or features, changes to correct non-compliances, etc. The Electrical Component/Subsystem Supplier is defined as a supplier who receives electrical requirements from GM.

The Supplier Hardware Change Management Process for Semiconductor Part Changes is to be used as a method for communicating the technical viability of a change proposal for any electrical component/subsystem. Any approval authority stated herein shall apply only to the technical element of the proposed change. This process does not replace the Engineering Work Order (EWO) or any other GM cost and investment process where the supplier receives authorization to change piece price, investment, etc. Also, this process does not replace any Production Part Approval Process (PPAP) or supplier quality requirements and processes.

Applicability.

This specification describes the process a supplier shall use to request approval for a semiconductor part change that may occur during normal production. This process includes the following:

a. Information that shall be included with the request, including supplier tasks to be completed prior to submitting the request.

b. Timing of information submittal, approval, completion of testing, and change in parts of delivered GM components.

c. Types of Semiconductor changes and the typical testing required based on the change including electrical behavior, environmental testing and Electromagnetic Compatibility (EMC) testing.

Remarks. Within this document the following conventions are applied:

The word "Shallʺ shall be used in the following ways:

a. To state a binding requirement, which is verifiable by external manipulation and/or observation.

b. To state a binding requirement upon a requirementʹs document that is verifiable through a review of the document.

The word ʺMustʺ shall be used to state a binding requirement which will have a corresponding Electronic Control Unit (ECU) document or Component Requirements Document. These requirements will be verified as part of the component verification.

The word ʺShouldʺ denotes a preference or desired conformance.


Edition : 2
File Size : 1 file , 140 KB
Number of Pages : 12
Published : 01/01/2018

History

GMW GMW16552
Published Date: 06/01/2024
Semiconductor Change Process Specification for Electrical and Electronic Component Validation
12.90 €
GMW GMW16552
Published Date: 01/01/2018
Semiconductor Change Process Specification
23.40 €
GMW GMW16552
Published Date: 03/01/2011
Semiconductor Change Process Specification
23.40 €

Related products

GMW GMW3034
Published Date: 08/01/2017
Absence of Hexavalent Chrome, Cr VI, in Coatings
12.90 €
GMW GMW8081
Published Date: 08/01/2016
Static Headspace GC-MS for Interior Materials Interior Emissions
12.90 €
GMW GMW3037
Published Date: 01/01/2019
Air Conditioning System Maximum Performance Validation for Passenger Vehicles
GMW GMW15847
Published Date: 04/01/2024
Floor Mat to Accelerator Pedal Interaction Evaluation
23.40 €

Best-Selling Products

GPA 101-43
Published Date: 01/01/1994
Standard Compression and Charcoal Tests for Determining the Natural Gasoline Content of Natural Gas
13.50 €
GPA 1167-83
Published Date: 1983
GPA Glossary - Definition of Words and Terms Used in the Gas Processing Industry
16.50 €
GPA 181-86
Published Date: 01/01/1986
Tentative Reference Bulletin Heating Value as a Basis for Custody Transfer of Natural Gas
19.50 €
GPA 194-94
Published Date: 1994
Tentative NGL Loading Practices
16.50 €
GPA 2103-20 Errata (July 2021)
Published Date: 2021
Errata (July 2021) to Method for the Analysis of Natural Gas Condensate Mixtures Containing Nitrogen and Carbon Dioxide by Gas Chromatography
GPA 2103-20
Published Date: 2020
Method for the Analysis of Natural Gas Condensate Mixtures Containing Nitrogen and Carbon Dioxide by Gas Chromatography
16.50 €