IEEE 1267-1999 PDF

IEEE 1267-1999 PDF

Name:
IEEE 1267-1999 PDF

Published Date:
12/30/1999

Status:
Active

Description:

IEEE Guide for Development of Specification for Turnkey Substation Projects

Publisher:
IEEE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$38.1
Need Help?
New IEEE Standard - Superseded. The technical requirements to engineer, design, specify, fabricate, manufacture, furnish,install, test, commission, and provide as-built documents for air-insulated substations are covered.This guide investigates the methods, practices, and requirements of both users and suppliers in order to promogate a systematic and coordinated approach for development of specifications for turn-key substation projects.
File Size : 1 file , 110 KB
ISBN(s) : 0738117595, 9780738117607
Note : This product is unavailable in Russia, Belarus
Number of Pages : 36
Product Code(s) : STDSU94763
Published : 12/30/1999

History

IEEE 1267-2019
Published Date: 03/15/2019
IEEE Guide for Development of Specifications for Turnkey Substation Projects
$31.8
IEEE 1267-1999
Published Date: 12/30/1999
IEEE Guide for Development of Specification for Turnkey Substation Projects
$38.1

Related products

IEEE 1534-2009
Published Date: 11/20/2009
IEEE Recommended Practice for Specifying Thyristor-Controlled Series Capacitors
$36.6
IEEE 1303-2011
Published Date: 08/26/2011
IEEE Guide for Static Var Compensator Field Tests
$39.6
IEEE C37.2-2022
Published Date: 12/14/2022
IEEE Standard for Electrical Power System Device Function Numbers, Acronyms, and Contact Designations
$25.2

Best-Selling Products