MIL MIL-C-48098B PDF

MIL MIL-C-48098B PDF

Name:
MIL MIL-C-48098B PDF

Published Date:
07/30/1982

Status:
Active

Description:

CHARGE, SPOTTING, PROJECTILE LOADING, ASSEMBLING AND PACKING (NO S/S DOCUMENT) (SUPERSEDING MIL-C-48098A)

Publisher:
Military Specifications and Standards

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$8.7
Need Help?

File Size : 1 file , 1.6 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 21
Published : 07/30/1982

History


Related products

MIL MIL-C-46908
Published Date: 11/14/1962
CHARGE, PROPELLING, 155MM, M3, LOADING, ASSEMBLING AND PACKING
$7.2
MIL MIL-P-60523A
Published Date: 05/18/1979
PROJECTILE, 165MM, HEP, M123A1 METAL PARTS (SUPERSEDING MIL-P-60523)
$10.2
MIL MIL-G-70721A
Published Date: 04/10/1992
GRENADE AND TUBE ASSEMBLY METAL PARTS ASSEMBLY (NO S/S DOCUMENT) (SUPERSEDING MIL-G-70721)
$7.2
MIL MIL-T-70638
Published Date: 11/18/1992
TEST PROJECTILE, 155MM, NON-HE, FOR M692/M731 TEST MINES LOADING, ASSEMBLING AND PACKING OF (NO S/S DOCUMENT) (SUPERSEDING MIL-P-63066)
$8.7

Best-Selling Products

PTI C30.1
Published Date: 01/01/2003
TRAINING AND CERTIFICATION OF FIELD PERSONNEL FOR UNBONDED POST-TENSIONING LEVEL 1 - FIELD FUNDAMENTALS
$21.9
PTI C30.1S
Published Date: 01/01/2006
ENTRENAMIENTO Y CERTIFICACIÓN DE PERSONAL DE CAMPO PARA POSTENSADO SIN TENDONES ADHERENTES
$21.9
PTI C30.2
Published Date: 01/01/2002
TRAINING AND CERTIFICATION OF FIELD PERSONNEL FOR UNBONDED POST-TENSIONING LEVEL 2 - IRONWORKER
PTI C30.3
Published Date: 01/01/2006
TRAINING AND CERTIFICATION OF FIELD PERSONNEL FOR UNBONDED POST-TENSIONING LEVEL 2 - POST-TENSIONING INSPECTOR
$29.4
PTI C30.4 ERTA
Published Date: 01/14/2022
Training and Certification of Field Personnel for Multistrand & Grouted Post‐Tensioning Student Manual
$0.3
PTI C30.4
Published Date: 02/01/2007
TRAINING AND CERTIFICATION OF FIELD PERSONNEL FOR BONDED POST-TENSIONING