MODUK DEF STAN 00-970: PT 1: SEC 8 PDF

MODUK DEF STAN 00-970: PT 1: SEC 8 PDF

Name:
MODUK DEF STAN 00-970: PT 1: SEC 8 PDF

Published Date:
07/05/2013

Status:
[ Revised ]

Description:

Design and Airworthiness Requirements for Service Aircraft Part 1: Fixed Wing Section 8: Gas Turbine Auxiliary Power Unit Installation

Publisher:
British Defence Standards

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
Need Help?

PREFACE

This Part of the Defence Standard provides requirements for Airworthiness and Design Certification for the design, development and testing of Fixed Wing Aircraft for UK Military operation. The requirements stated herein shall be applied by the Ministry of Defence (MOD) and the contractor as agreed and defined in the contract.

This document has been produced on behalf of the Military Aviation Authority Executive Board (MEB) by the Military Aviation Authority (MAA), MAA Technical Group, MOD Abbey Wood.

The appropriate Parts of this document are to be used, when called up in the Contract, for all future designs, and whenever practicable for amendments to existing designs. If any difficulty arises which prevents application of this document, MAA-Cert-ADS1-DS970 shall be informed so that a remedy may be sought: e-mail: MAA-Cert-ADS [email protected]


Edition : I10
Number of Pages : 10
Published : 07/05/2013

History

MODUK DEF STAN 00-970: PT 1: SEC 8
Published Date: 07/13/2015
Design and Airworthiness Requirements for Service Aircraft Part 1: Fixed Wing Section 8: Gas Turbine Auxiliary Power Unit Installation
$0.9
MODUK DEF STAN 00-970: PT 1: SEC 8
Published Date: 01/10/2014
Design and Airworthiness Requirements for Service Aircraft - Part 1: Fixed Wing - Section 8: Gas Turbine Auxiliary Power Unit Installation
MODUK DEF STAN 00-970: PT 1: SEC 8
Published Date: 07/05/2013
Design and Airworthiness Requirements for Service Aircraft Part 1: Fixed Wing Section 8: Gas Turbine Auxiliary Power Unit Installation
MODUK DEF STAN 00-970: PT 1: SEC 8
Published Date: 01/07/2013
Design and Airworthiness Requirements for Service Aircraft Part 1 Fixed Wing Section 8 Gas Turbine Auxiliary Power Unit Installation
MODUK DEF STAN 00-970: PT 1: SEC 8
Published Date: 07/20/2012
Design and Airworthiness Requirements for Service Aircraft - Part 1 Fixed Wing - Section 8 Gas Turbine Auxiliary Power Unit Installation
MODUK DEF STAN 00-970: PT 1: SEC 8
Published Date: 10/31/2011
Design and Airworthiness Requirements for Service Aircraft Part 1 Fixed Wing Section 8 Gas Turbine Auxiliary Power Unit Installation
MODUK DEF STAN 00-970: PT 1: SEC 8
Published Date: 01/31/2011
Design and Airworthiness Requirements for Service Aircraft Part 1 Fixed Wing Section 8 - Gas Turbine Auxiliary Power Units
MODUK DEF STAN 00-970: PT 1: SEC 8
Published Date: 01/31/2007
Design and Airworthiness Requirements for Service Aircraft Part 1 Section 8 - Gas Turbine Auxiliary Power Units
MODUK DEF STAN 00-970: PT 1: SEC 8
Published Date: 12/01/1999
Design and Airworthiness Requirements for Service Aircraft Gas Turbine Auxiliary Power Units

Related products

MODUK DEF STAN 40-2
Published Date: 08/01/1971
Wire Rope, Steel
$0.9

Best-Selling Products

CEPT T/R 34-01
Published Date: 01/01/1987
Specifications Des Equipements Radioelectriques Mobiles Maritimes
$12.6
CEPT T/SF 66 E
Published Date: 01/01/1990
Services and Facilities Aspects of Digital European Cordless Telecommunications (DECT)
$1.5