Name:
MODUK DEF STAN 59-41: PART 5 PDF
Published Date:
02/05/2003
Status:
[ Cancelled ]
Publisher:
British Defence Standards
In this Part of the Defence Standard clause 5 specifies the performance requirements for transient and pulse generators. Clause 8 gives similar information on the injection probes needed to couple generator output into an equipment under test. In clause 9 performance requirements are given for the calibration jigs needed to verify generator performance. In clause 10 information is provided on the requirements for special voltage probes and their calibration. Clause 12 specifies the impedance/frequency compliance requirements for the Line Impedance Stabilizing Network (LISN) called up in the tests described in the various sections to Part 3 of this Standard. Some non-mandatory constructional information and a LISN calibration procedure are provided. Clauses 13 & 14 describe the method of damping a screened room, the damping performance of the screened room and the verification procedures for measuring the screen rooms performance. Clause 15 prescribes a design of a twin-T filter to be used with the voltage probe when performing DCE03.3 and DCS01.2 & DCS01.3 measurements.
| Edition : | I3 |
| Number of Pages : | 210 |
| Published : | 02/05/2003 |