NACE SP0297-2012 PDF

NACE SP0297-2012 PDF

Name:
NACE SP0297-2012 PDF

Published Date:
06/23/2012

Status:
Active

Description:

Maintenance Painting of Electrical Substation Apparatus Including Flow Coating of Transformer Radiators

Publisher:
National Association of Corrosion Engineers

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$53.7
Need Help?
This standard practice provides guidance for properly engineering and implementing maintenance painting programs for electrical substation apparatus. Subjects covered include surface preparation, coating selection, application, inspection, safety and hazardous waste considerations, and contractor qualifications. There are two appendixes; one with a sample painting specification and another about alternating current minimum safe working distances. This standard is maintained by Task Group (TG) 457.
File Size : 1 file , 160 KB
ISBN(s) : 1575900424
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 16
Published : 06/23/2012

History

NACE SP0297-2012
Published Date: 06/23/2012
Maintenance Painting of Electrical Substation Apparatus Including Flow Coating of Transformer Radiators
$53.7
NACE RP0297-97 (R2004)
Published Date: 03/31/2004
Maintenance Painting of Electrical Substation Apparatus Including Flow Coating of Transformer Radiators
$53.7

Related products

NACE SP0178-2007
Published Date: 03/10/2007
Design, Fabrication, and Surface Finish Practices for Tanks and Vessels to Be Lined for Immersion Service
$53.7
NACE SP0298-2023
Published Date: 05/15/2023
Standard Practice - Sheet Rubber Linings for Abrasion and Corrosion Service
$32.7
NACE SP0892-2007
Published Date: 08/14/2007
Standard Practice - Coatings and Linings over Concrete for Chemical Immersion and Containment Service
$53.7

Best-Selling Products

Impact & Blast Loading of Concrete
Published Date: 06/01/1990