NG AMBP 130 PDF

NG AMBP 130 PDF

Name:
NG AMBP 130 PDF

Published Date:
06/01/2018

Status:
[ Active ]

Description:

Asset Management Business Procedure - Management of OHL Work in ETO Operations

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$138
Need Help?

PURPOSE AND SCOPE

The purpose of this document is to explain the requirements for planning and managing work undertaken by Electricity Transmission Operator (ETO) Operations Over Head Lines (OHL). This procedure identifies the requirements that must be achieved: before work starts, when setting OHL employees to work, during delivery of work and the review process following completion of work activities.

Application of this procedure within ETO Operations OHL provides a national approach to the planning, preparation and delivery of work ensuring a Safe System of Work (SSOW) for ETO Operations OHL.

This document does not manage major OHL project works such as full OHL refurbishments. These works are undertaken in accordance with AMBP308 ETO “Operations undertaking CDM Principal Contractor Responsibilities”.

This procedure shall be followed in conjunction with other National Grid procedures including National Grid’s Electricity Safety Rules, National Safety Instructions (NSIs), Transmission Procedures (TPs) and Asset Management Business Procedures (AMBPs) applicable to the planning, preparation and safe delivery of ETO Operations OHL work.


Edition : 4
File Size : 1 file , 230 KB
Number of Pages : 28
Published : 06/01/2018

History

NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138

Related products

NG UKBP/TP 235
Published Date: 05/01/2016
UK Business Procedure/Transmission Procedures - Digital Engineering (PAS 1192-2&5)
$147.3
NG TS 3.24.03
Published Date: 11/01/2000
National Grid Technical Specifications - Substation Facilities & Functions Common to all Bays
$55.2
NG TGN(E) 212
Published Date: 08/01/2015
Technical Guidance Notes - National Grid Protection Application and Setting at Railway Suppy Points
$55.2
NG DH 12
Published Date: 07/01/2011
Design Handbook - Guidance on Grid Code Compliance Process for Design Assurance Engineers & Relay Settings Engineers
$55.2

Best-Selling Products