NG CH 10 PDF

NG CH 10 PDF

Name:
NG CH 10 PDF

Published Date:
11/01/2006

Status:
[ Revised ]

Description:

Commissioning Handbook - Procedure Primary and Secondary Injection Requirement for an Additional Circuit of High Impedance Circulating Current Busbar Protection with Single (Duplicated) Relays per Zone

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$55.2
Need Help?

PURPOSE

The purpose of this procedure is to specify the arrangements for the primary and secondary injection of an additional circuit of busbar protection, for a High Impedance circulating current scheme with a single (duplicated) relay per zone (typically a 275kV double busbar scheme).


Edition : 1
File Size : 1 file , 880 KB
Number of Pages : 14
Published : 11/01/2006

History

NG CH 10
Published Date: 06/01/2015
Commissioning Handbook - Primary and Secondary Injection Requirement for an Additional Circuit of High Impedance Circulating Current Busbar Protection with Single (Duplicated) Relays per Zone
$55.2
NG CH 10
Published Date: 11/01/2006
Commissioning Handbook - Procedure Primary and Secondary Injection Requirement for an Additional Circuit of High Impedance Circulating Current Busbar Protection with Single (Duplicated) Relays per Zone
$55.2

Related products

NG PS(T) 087
Published Date: 10/01/2009
Policy Statements - Overhead Line Separation From Wind Turbines
$138
NG PS(T) 010
Published Date: 04/01/2018
Policy Statements - Application and Protection Setting Policy for the National Grid UK Transmission System
$257.7
NG TGN(T) 127
Published Date: 08/01/1997
Technical Guidance Notes - Modelling of an Auto-Transformer with Tertiary Loading
$55.2
NG SCT 20.16.04
Published Date: 01/01/2002
Site Commissioning Tests - REL 352/TC-10B Unit Feeder Protection
$55.2

Best-Selling Products

Vitamins and Minerals Handbook
Published Date: 04/01/2001
$3.9