NG CH 16 PDF

NG CH 16 PDF

Name:
NG CH 16 PDF

Published Date:
04/01/2002

Status:
[ Active ]

Description:

Commissioning Handbook - Procedure for Connecting an Additional Circuit Breaker Fail Protection to a Double Busbar Substation with a Common Relay Room

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$55.2
Need Help?

PURPOSE

The purpose of this procedure, is to provide a model process for the checks and tests to be performed on a circuit breaker fail scheme which is being extended (as a result of adding a new Feeder Bay), at an existing double busbar substation with a common relay room. The procedure is also applicable where an existing circuit breaker fail scheme is being replaced. The tests are to be performed both before and after connection to the existing D.C. bus wiring associated with the back-tripping scheme. These checks and tests are required to ensure that:

• Appropriate checks and tests have been performed on the new circuit breaker fail scheme - to ensure that it has been correctly installed and is fully functional.

• The system provided is compatible with the existing system already installed.


Edition : 1
File Size : 1 file , 100 KB
Number of Pages : 17
Published : 04/01/2002

History


Related products

NG TS 3.08.20
Published Date: 09/01/1992
National Grid Technical Specifications - Non Metallic Optical Cable for Use in Ducts
$59.1
NG UKBP/TP 155A
Published Date: 03/01/2009
UK Business Procedure/Transmission Procedures - Customer Build Schemes
$55.2
NG TS 3.05.06
Published Date: 07/01/1999
Technical Specifications (NGTS) - Cable Sealing End Insulators
$55.2
NG TS 3.07.35
Published Date: 02/01/1999
Technical Specifications (NGTS) - Standalone Quadrature Booster Control Systems
$59.1

Best-Selling Products