NG CH 17 PDF

NG CH 17 PDF

Name:
NG CH 17 PDF

Published Date:
03/01/2002

Status:
[ Active ]

Description:

Commissioning Handbook - Procedure for Connecting an Additional Circuit Breaker Fail Protection to a Double Busbar Substation with Individual Relay Rooms

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
ng-ch-17_2845935

Choose Document Language:
55.20 €
Need Help?

The purpose of this procedure, is to provide a model process for the checks and tests to be performed on a circuit breaker fail scheme which is being extended (as a result of adding a new Feeder Bay), at an existing double busbar substation with individual relay rooms. The procedure is also applicable where an existing circuit breaker fail scheme is being replaced. The tests are to be performed both before and after connection to the existing D.C. bus-wiring associated with the back-tripping scheme. These checks and tests are required to ensure that:

• Appropriate checks and tests have been performed on the new circuit breaker fail scheme - to ensure that it has been correctly installed and is fully functional.

• The system provided is compatible with the existing system already installed.


Edition : 1
File Size : 1 file , 90 KB
Number of Pages : 18
Published : 03/01/2002

History


Related products

NG TS 3.24.92
Published Date: 02/01/2012
Technical Specifications - Phasor Measurement Unit
138.00 €
NG SCT 35.01
Published Date: 08/01/1998
Site Commissioning Tests - GEC PERM Automatic Reactive Switching (ARS) System
55.20 €
NG TS 3.24.42
Published Date: 06/01/2001
National Grid Technical Specifications - Automatic Reactive Switching for HV and LV Shunt Reactive Plant
55.20 €
NG TS 3.01.03
Published Date: 01/01/2013
Technical Specifications - Limitation of Fire Risk In Substations
138.00 €

Best-Selling Products