NG CH 19 PDF

NG CH 19 PDF

Name:
NG CH 19 PDF

Published Date:
01/01/2003

Status:
[ Active ]

Description:

Commissioning Handbook - Primary and Secondary Injection of Double Wound Transformers and their Main Protections

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
ng-ch-19_2797087

Choose Document Language:
55.20 €
Need Help?

PURPOSE

The purpose of this procedure is to provide a model process for the checks and tests to be performed on double or triple wound power transformers. It specifies minimum requirements and may be added to by the contractor when devising test programmes. These checks and tests are required to ensure that:

• The transformer is correctly phased to the HV, LV and tertiary systems

• The protection equipment is correctly aligned in phase and magnitude with its associated power transformer.


Edition : 1
File Size : 1 file , 260 KB
Number of Pages : 29
Published : 01/01/2003

History


Related products

NG TS 3.08.02
Published Date: 07/01/2000
National Grid Technical Specifications - Tunnel Communications
59.10 €
NG TS 3.01.02
Published Date: 09/01/2014
Technical Specifications - Earthing
310.50 €
NG TGN(E) 217
Published Date: 05/01/2011
Technical Guidance Notes - Safety Risk Management Hazard Zones Associated With Overdue Maintenance
138.00 €
NG TGN(E) 092
Published Date: 12/01/2003
Technical Guidance Notes - Switching Procedures to Limit Trapped Charge Over-Voltages In 132 Kv, 275 Kv and 400 Kv Gas-Insulated Switchgear (Gis) Substations
138.00 €

Best-Selling Products

Policy & Planning As Public Choice
Published Date: 09/01/1999
23.70 €