NG TGN(E) 092 PDF

NG TGN(E) 092 PDF

Name:
NG TGN(E) 092 PDF

Published Date:
12/01/2003

Status:
[ Active ]

Description:

Technical Guidance Notes - Switching Procedures to Limit Trapped Charge Over-Voltages In 132 Kv, 275 Kv and 400 Kv Gas-Insulated Switchgear (Gis) Substations

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$138
Need Help?

This document advises good operational practice for normal switching procedures to minimise trapped charge over-voltages produced in Gas Insulated Switchgear (GIS) Substations. The guidance is applicable to all GIS at 132 kV, 275 kV and 400 kV. On account of the low risks involved, this advice may be disregarded during emergency conditions.

When applying these procedures, the Control Person (Operations) should consider the wider implications and verify that normal operating standards are not contravened.


Edition : 2
File Size : 1 file , 120 KB
Number of Pages : 10
Published : 12/01/2003

History


Related products

NG TS 3.04.10
Published Date: 12/01/1998
National Grid Technical Specifications - Requirements for Type Registration of Overhead Line Fittings and Fitting Drawings
$55.2
NG UKBP/TP 109
Published Date: 07/01/2015
UK Business Procedure/Transmission Procedures - Numbering and Nomenclature of HV Apparatus
$55.2
NG TS 3.07.36
Published Date: 01/01/2000
Technical Specifications (NGTS) - Data Acquisition Equipment at Sites Remote to NGC Substations
$59.1
NG CH 07
Published Date: 10/01/2009
Commissioning Handbook - Primary and Secondary Injection of Mesh Corner Protection
$55.2

Best-Selling Products

IDEA CL-2-2017
Published Date: 07/01/2017
IDW Attribute Value Guideline v05.05