NG CH 20 PDF

NG CH 20 PDF

Name:
NG CH 20 PDF

Published Date:
02/01/2014

Status:
[ Revised ]

Description:

Commissioning Handbook - Settings Loading Verification Test

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
Need Help?

PURPOSE The purpose of this procedure is to provide a model process to detail the checks and tests to be performed when undertaking a settings loading verification test. It specifies the minimum requirement and may be added to by the contractor or NG Commissioning Engineer when devising test programmes. These checks and tests are designed to ensure that:

• The test highlights any incorrectly set relay, any incorrectly enabled functionality (e.g. stages of overcurrent within a multifunction relay) which may impinge on the load carrying capability of the circuit. The test will also highlight any relay rating or interpose CT error, which may be incorrectly limiting the primary circuit’s load carry capability.

• The test is also designed to confirm the circuit's secondary loading capability with a view to verifying that there is no conflict with the statements made to Market Operations on the Thermal rating Schedules submitted prior to energisation.

• The test is not designed to highlight any incorrect functionality that may be present that relates to a fault current condition i.e. an incorrect overcurrent setting that is well above load but operates incorrectly for an ‘out of zone’ system fault. This should be highlighted during stage 1 relay secondary injection testing as defined by SCT proceduresPURPOSE The purpose of this procedure is to provide a model process to detail the checks and tests to be performed when undertaking a settings loading verification test. It specifies the minimum requirement and may be added to by the contractor or NG Commissioning Engineer when devising test programmes. These checks and tests are designed to ensure that:

• The test highlights any incorrectly set relay, any incorrectly enabled functionality (e.g. stages of overcurrent within a multifunction relay) which may impinge on the load carrying capability of the circuit. The test will also highlight any relay rating or interpose CT error, which may be incorrectly limiting the primary circuit’s load carry capability.

• The test is also designed to confirm the circuit's secondary loading capability with a view to verifying that there is no conflict with the statements made to Market Operations on the Thermal rating Schedules submitted prior to energisation.

• The test is not designed to highlight any incorrect functionality that may be present that relates to a fault current condition i.e. an incorrect overcurrent setting that is well above load but operates incorrectly for an ‘out of zone’ system fault. This should be highlighted during stage 1 relay secondary injection testing


Edition : 2
Number of Pages : 19
Published : 02/01/2014

History

NG CH 20
Published Date: 06/01/2015
Commissioning Handbook - Settings Loading Verification Test
$55.2
NG CH 20
Published Date: 02/01/2014
Commissioning Handbook - Settings Loading Verification Test
NG CH 20
Published Date: 03/01/2004
Commissioning Handbook - Settings Loading Verification Test

Related products

NG TS 3.06.18
Published Date: 02/01/1999
National Grid Technical Specifications - Protection for Shunt Reactors
$55.2
NG TGN(E) 240
Published Date: 11/01/2010
Technical Guidance Notes - Type Registration of Cable Systems
$138
NG DH 27
Published Date: 10/01/2012
Design Handbook - Application Guidance for The Use of Disconnector Auxiliary Contacts In Protection Schemes
$266.4
NG TS 2.08
Published Date: 04/01/1994
National Grid Technical Specifications - Telecommunications
$55.2

Best-Selling Products

ATIS 0100001.2004(S2018)
Published Date: 10/01/2004
User Plane Security Guidelines and Requirements for ETS
$18
ATIS 0100002
Published Date: 07/01/2004
Reliability Aspects of Next Generation Networks
$43.5
ATIS 0100003
Published Date: 11/01/2004
User Plane Priority Levels for IP Networks and Services
$18
ATIS 0100004
Published Date: 01/01/2006
Availability & Restorability Aspects of Emergency Telecommunications Service (ETS)
$33
ATIS 0100005.2006 (S2016)
Published Date: 05/01/2007
Auditory Non-Intrusive Quality Estimation Plus (ANIQUE+): Perceptual Model for Non-Intrusive Estimation of Narrowband Speech Quality
$33
ATIS 0100006
Published Date: 05/01/2006
Service Restoration Priority Levels for IP Networks
$18