Description:

Commissioning Handbook - Settings Loading Verification Test

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$55.2
Need Help?

PURPOSE

The purpose of this procedure is to provide a model process to detail the checks and tests to be performed when undertaking a settings loading verification test. It specifies the minimum requirement and may be added to by the Contractor or NG Commissioning Engineer when devising test programmes. These checks and tests are designed to ensure that:

  • The test highlights any incorrectly set relay, any incorrectly enabled functionality (e.g. stages of overcurrent within a multifunction relay) which may impinge on the load carrying capability of the circuit. The test will also highlight any relay rating or interpose CT error, which may be incorrectly limiting the primary circuit’s load carry capability.

  • The test is also designed to confirm the circuit's secondary loading capability with a view to verifying that there is no conflict with the statements made to Market Operations on the Thermal Rating Schedules submitted prior to energisation.

  • The test is not designed to highlight any incorrect functionality that may be present that relates to a fault current condition i.e. an incorrect overcurrent setting that is well above load but operates incorrectly for an ‘out of zone’ system fault. This should be highlighted during stage 1 relay secondary injection testing as defined by SCT procedures.


Edition : 3
File Size : 1 file , 330 KB
Number of Pages : 19
Published : 06/01/2015

History

NG CH 20
Published Date: 06/01/2015
Commissioning Handbook - Settings Loading Verification Test
$55.2
NG CH 20
Published Date: 02/01/2014
Commissioning Handbook - Settings Loading Verification Test
NG CH 20
Published Date: 03/01/2004
Commissioning Handbook - Settings Loading Verification Test

Related products

NG TS 3.24.75
Published Date: 03/01/2001
National Grid Technical Specifications - DAR Interlocking (Trip Relay Reset)
$55.2
NG SCT 20.12.15
Published Date: 08/01/2000
Site Commissioning Tests - SCHWEITZER SEL 321-2 Distance Protection with Integral Signalling
$55.2
NG TGN(E) 066
Published Date: 09/01/2000
Technical Guidance Notes - Thermal Overload Capabilities of Protection Equipment
$138
NG TS 2.03
Published Date: 12/01/2015
Technical Specifications - Power Transformers and Reactors
$138

Best-Selling Products

NORSOK C-001:2022
Published Date: 03/21/2022
Living quarters area
NORSOK C-004:2019+AC:2022
Published Date: 10/23/2019
Helicopter deck on offshore installations
NORSOK D-002
Published Date: 01/13/2020
Well intervention equipment
NORSOK D-007
Published Date: 03/26/2021
Well testing, clean-up and flowback systems
NORSOK D-010:2021+AC2:2021
Published Date: 12/23/2021
Well integrity in drilling and well operations
NORSOK D-010/AC:2021
Published Date: 06/23/2021
CORRIGENDUM: Well integrity in drilling and well operations