NG CH 25 PDF

NG CH 25 PDF

Name:
NG CH 25 PDF

Published Date:
12/01/2006

Status:
[ Active ]

Description:

Commissioning Handbook - Primary and Secondary Injection of Reactors and their Main Protections

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$55.2
Need Help?

PURPOSE

The purpose of this procedure is to provide a model process for the checks and tests to be carried out when commissioning reactor protection. It specifies minimum requirements and may be added to by the contractor when devising test programmes. This procedure is applicable to both Shunt and Series Reactors. In figures A1 to A5 and B1 to B5, dotted lines refer to primary configuration for Shunt Reactors only. These checks and tests are required to ensure that: The protection equipment is correctly aligned in phase and magnitude with its associated reactor.


Edition : 1
File Size : 1 file , 1.4 MB
Number of Pages : 24
Published : 12/01/2006

History


Related products

NG CH 01
Published Date: 01/01/2008
Commissioning Handbook - Model format for a Commissioning Programme
$55.2
NG TGN(E) 267
Published Date: 05/01/2016
Technical Guidance Notes - Technology Availability for Strategic Optioneering
$147.3
NG NGUK/CD/BP 213E
Published Date: 10/01/2014
UK Capital Delivery Business Procedures - Avoidance of Buried Services
$55.2
NG TGN(E) 231
Published Date: 01/01/2010
Technical Guidance Notes - Risk Assessment for Overhead Line Feeder Circuits in Gas-Insulated Switchgear (GIS) Substations
$59.1

Best-Selling Products

PDI BPSGI
Published Date:
Basic Principles for Sizing Grease Interceptors
PDI G 101
Published Date: 03/01/2010
Testing and Rating Procedure for Hydro Mechanical Grease Interceptors with Appendix of Installation and Maintenance
PDI G 102
Published Date:
Testing and Certification for Grease Interceptors with FOG Sensing and Alarm Devices
PDI GGI-EM
Published Date: 01/01/2010
Guide To Grease Interceptors: Eliminating the Mystery
PDI MGO
Published Date:
Model Grease Ordinance
PDI MSREPFS
Published Date: 01/01/2009
MINIMUMSPACE REQUIREMENTS FOR ENCLOSED PLUMBING FIXTURE SUPPORTS