NG CH 27 PDF

NG CH 27 PDF

Name:
NG CH 27 PDF

Published Date:
09/01/2015

Status:
[ Active ]

Description:

Commissioning Handbook - Commissioning Application of TP107 to Alstom Grid MiCOM / Agile relays

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
ng-ch-27_2813382

Choose Document Language:
55.20 €
Need Help?

PURPOSE

The purpose of this procedure is to outline the recommended practice for applying settings and configuration files to new multi-function relay protections on the National Grid system. This covers protection installed on new sites and also asset replacement protection.

This document should be used in conjunction with Transmission Procedure TP107, Protection & Control Relay Settings, and Commissioning Handbook 21, Management of Numerical Protection Schemes.

The software version used to undertake the comparison should be dictated by the relay setting sheet.


Edition : 4
File Size : 1 file , 1.1 MB
Number of Pages : 24
Published : 09/01/2015

History

NG CH 27
Published Date: 09/01/2015
Commissioning Handbook - Commissioning Application of TP107 to Alstom Grid MiCOM / Agile relays
55.20 €
NG CH 27
Published Date: 10/01/2013
Commissioning Handbook - Commissioning Application of TP107 to Alstom Grid MiCOM relays
55.20 €

Related products

NG TS 3.04.07
Published Date: 03/01/2010
Technical Specifications - Vibration Dampers for Overhead Line Conductors
55.20 €
NG CH 06
Published Date: 10/01/2013
Commissioning Handbook - Current Transformers
55.20 €
NG TS 3.08.14
Published Date: 09/01/1992
National Grid Technical Specifications - Control Telephony Switching Equipment at National and Area Control Centres
59.10 €
NG TGN(T) 041
Published Date: 01/01/1993
Technical Guidance Notes - General Requirements for the Installation of Externally Attached Optical Cable to Overhead Line Earthwires
55.20 €

Best-Selling Products