NG CH 33 PDF

NG CH 33 PDF

Name:
NG CH 33 PDF

Published Date:
12/01/2013

Status:
[ Active ]

Description:

Commissioning Handbook - Commissioning Application of TP107 to Global Substation Solutions GE UR Relays

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$55.2
Need Help?

PURPOSE

The purpose of this procedure is to outline the recommended practice for applying settings and configuration files to new multi-function relay protections on the National Grid system. This covers protection installed on new sites and also asset replacement protection.

This document should be used in conjunction with Transmission Procedure TP107, Protection & Control Relay Settings, and Commissioning Handbook 21, Management of Numerical Protection Schemes.

This procedure applies to the GE UR family of relays. The software version used to undertake the comparison should be dictated by the relay setting sheet.


Edition : 1
File Size : 1 file , 500 KB
Number of Pages : 10
Published : 12/01/2013

History


Related products

NG TS 2.18
Published Date: 03/01/2002
National Grid Technical Specifications - Static Var Compensators (SVCs) for Connection to Transformer Tertiary Windings
$55.2
NG TGN(T) 047
Published Date: 02/01/1994
Technical Guidance Notes - Design and Use of Skycradles at Line Crossings of Motorways, Other Major Roads and Railways
$138
NG TS 3.24.15
Published Date: 12/01/2000
National Grid Technical Specifications - Environmental and Test Requirements for Electronic Equipment
$55.2
NG TS 3.24.17
Published Date: 08/01/2000
National Grid Technical Specifications - Ferroresonance Suppression
$55.2

Best-Selling Products