NG NGUK/CON/BP 135E PDF

NG NGUK/CON/BP 135E PDF

Name:
NG NGUK/CON/BP 135E PDF

Published Date:
04/01/2008

Status:
[ Active ]

Description:

UK Construction Business Procedures - Transmission Construction Electricity Design Management for Legacy Projects

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$55.2
Need Help?

PURPOSE AND SCOPE

This procedure specifies the detailed requirements of TP146 – Investment Process with reference to both the design production tasks undertaken by the Suppliers, and the design assurance tasks undertaken by Core Construction (Technical Assurance).

This procedure excludes the system design requirements undertaken by Electrical Network Investment.

The purpose of this procedure is to define arrangements that ensure the following.

a) That National Grid discharges its legal obligations with reference to health, safety and environmental requirements – with particular focus upon the objective of 'zero by design' – see NSBP199.

b) That project design is undertaken in accordance with National Grid technical policy and the suite of technical specifications and supporting documents.

c) That the design solution is fully specified, integrated and holistic across all technical disciplines, and is executed efficiently both to negate errors and to optimise the use of design engineering resources and skills.

d) That for reasons of maximising both SHES performance and power system reliability those undertaking project design tasks possess a requisite minimum skill set, which is displayed either through a certificate of authorisation (Construction) or other formal means (Asset Management).

e) That project design is undertaken with a demonstrable level of technical governance – resulting in an effective audit trail.

This procedure shall apply to all technical disciplines across all schemes which comprise the National Grid Electrical capital programme undertaken by Transmission Electricity Legacy Projects.

A diagram showing the key stages of the project design process relevant to this procedure is provided in Appendix A.


Edition : 3
File Size : 1 file , 230 KB
Number of Pages : 44
Published : 04/01/2008

History


Related products

NG TS 3.24.43
Published Date: 12/01/2000
National Grid Technical Specifications - Interlocking
$55.2
NG TS 3.24.04
Published Date: 08/01/2000
National Grid Technical Specifications - Hardware Platform
$55.2
NG SCT 20.05.03
Published Date: 06/01/2011
Site Commissioning Tests - Overcurrent/Earth Fault Protection
$55.2
NG TS 3.04.19
Published Date: 05/01/2010
Technical Specifications - Fixed Fall Arrest Systems for Overhead Line Towers
$55.2

Best-Selling Products