NG SCT 16.08 PDF

NG SCT 16.08 PDF

Name:
NG SCT 16.08 PDF

Published Date:
09/01/1998

Status:
[ Active ]

Description:

Site Commissioning Tests - BMI 8010 PQNode Quality of Supply Monitor

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
ng-sct-16-08_2816696

Choose Document Language:
55.20 €
Need Help?

This schedule covers the following:

(i) De-commissioning of the associated Settlement Metering and description of associated work required to connect the PQNode recorder. (Main 2 Metering and Data Collector B).

(ii) Re-commissioning of Settlement Metering (Main 2 Metering and Data Collector B).

(iii) Commissioning of PQNode recorder.

Commissioning of the RFL connection will be covered in a future issue of this document.


Edition : 2
File Size : 1 file , 130 KB
Number of Pages : 15
Published : 09/01/1998

History


Related products

NG TS 2.05
Published Date: 07/01/2015
Technical Specifications - Cable Systems
55.20 €
NG PS(T) 044
Published Date: 12/01/2004
Policy Statement - Back-Up Protection Grading Across National Grid Transco/Distribution Network Operator Interfaces
59.10 €
NG TS 3.04.29
Published Date: 04/01/2016
Technical Specifications - Specification for The Design of New 400 Kv Transmission Line Towers (L13)
55.20 €
NG UKBP/TP 236
Published Date: 04/01/2018
UK Business Procedure/Transmission Procedure - Key Transmission Procedure Minimum Requirements as Applied to The Delivery of Electricity Transmission Single Asset Replacment/refurbishment/recondition Investments
147.00 €

Best-Selling Products