NG TGN(E) 056 PDF

NG TGN(E) 056 PDF

Name:
NG TGN(E) 056 PDF

Published Date:
01/01/2014

Status:
[ Active ]

Description:

Technical Guidance Notes - Settlement Metering

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$138
Need Help?

PURPOSE AND SCOPE

This Technical Guidance Note provides guidance for project engineers and contractors to ensure that Settlement Metering meets with Balancing and Settlement Code (BSC) requirements.

The scope is restricted to 3-phase 4-wire metering which covers the majority of National Grid metering applications. Advice for other applications e.g. single phase shall be sought from National Grid Asset Integrity.

This issue has been produced to reflect modified requirements based on new solutions to be delivered under the National Grid Settlement Metering Light Current Upgrade Project (started 2013) and for new installations.

Failure to comply with the recommendations of this TGN may result in the metering system not being accepted for registration by Elexon.


Edition : 3
File Size : 1 file , 130 KB
Number of Pages : 18
Published : 01/01/2014

History


Related products

NG CH 03
Published Date: 01/01/1999
Commissioning Handbooks - Generic Switching Programme - MFDA2 Protection Replacement
$55.2
NG UKBP/TP 182
Published Date: 11/01/2018
UK Business Procedure/Transmission Procedures - Management of Outstanding Works
$55.2
NG SCT 37.01
Published Date: 01/01/2000
Site Commissioning Tests - ABB NSD70 Signalling Equipment
$55.2
NG UKBP/TP 211
Published Date: 05/01/2016
UK Business Procedure/Transmission Procedures - Bulk Purchase NGET Sourced Equipment Procedure
$147.3

Best-Selling Products

IGEM UP/2
Published Date: 06/01/2014
Installation pipework on industrial and commercial premises