NG UKBP/TP 109 PDF

NG UKBP/TP 109 PDF

Name:
NG UKBP/TP 109 PDF

Published Date:
07/01/2015

Status:
[ Revised ]

Description:

UK Business Procedure/Transmission Procedures - Numbering and Nomenclature of HV Apparatus

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
ng-ukbp-tp-109_2846640

Choose Document Language:
55.20 €
Need Help?

PURPOSE AND SCOPE

This procedure describes the allocation of Numbering and Nomenclature to High Voltage Equipment on the National Grid Electricity Transmission (NGET) System.

It implements Grid Code requirement Operating Code (OC) No. 11 "Numbering and Nomenclature of High Voltage Apparatus at Certain Sites." In that:

• NGET HV Equipment on Users' Sites; and

• User HV Equipment on NGET Sites;

shall have numbering and nomenclature in accordance with the system used by NGET.

To ensure, so far as possible, the safe and effective operation of the total Transmission System and to reduce the risk of human error faults by requiring, in certain circumstances, that the numbering and nomenclature of Users' HV Equipment shall be in accordance with the numbering system used by NGET.


Edition : 3B
File Size : 1 file , 650 KB
Number of Pages : 50
Published : 07/01/2015

History

NG UKBP/TP 109
Published Date: 07/01/2015
UK Business Procedure/Transmission Procedures - Numbering and Nomenclature of HV Apparatus
55.20 €
NG UKBP/TP 109
Published Date: 03/01/2015
UK Business Procedure/Transmission Procedures - Numbering and Nomenclature of HV Apparatus
55.20 €
NG UKBP/TP 109
Published Date: 04/01/2011
UK Business Procedure/Transmission Procedures - Numbering and Nomenclature of HV Apparatus
55.20 €

Related products

NG CH 16
Published Date: 04/01/2002
Commissioning Handbook - Procedure for Connecting an Additional Circuit Breaker Fail Protection to a Double Busbar Substation with a Common Relay Room
55.20 €
NG UKBP/TP 205
Published Date: 04/01/2015
UK Business Procedure/Transmission Procedures - Work Planning Process
138.00 €
NG SCT 01
Published Date: 01/01/2013
Site Commissioning Tests - Requirements for Site Commissioning Tests - On Protection & Control Equipment
55.20 €
NG TS 3.08.19
Published Date: 02/01/1994
National Grid Technical Specifications - Plesiochronous Digital Hierarchy Optical Line Termination and Multiplexer Equipment
59.10 €

Best-Selling Products

Welding Encyclopedia
Published Date: 01/01/1988
8.40 €