NG UKBP/TP 109 PDF

NG UKBP/TP 109 PDF

Name:
NG UKBP/TP 109 PDF

Published Date:
07/01/2015

Status:
[ Revised ]

Description:

UK Business Procedure/Transmission Procedures - Numbering and Nomenclature of HV Apparatus

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$55.2
Need Help?

PURPOSE AND SCOPE

This procedure describes the allocation of Numbering and Nomenclature to High Voltage Equipment on the National Grid Electricity Transmission (NGET) System.

It implements Grid Code requirement Operating Code (OC) No. 11 "Numbering and Nomenclature of High Voltage Apparatus at Certain Sites." In that:

• NGET HV Equipment on Users' Sites; and

• User HV Equipment on NGET Sites;

shall have numbering and nomenclature in accordance with the system used by NGET.

To ensure, so far as possible, the safe and effective operation of the total Transmission System and to reduce the risk of human error faults by requiring, in certain circumstances, that the numbering and nomenclature of Users' HV Equipment shall be in accordance with the numbering system used by NGET.


Edition : 3B
File Size : 1 file , 650 KB
Number of Pages : 50
Published : 07/01/2015

History

NG UKBP/TP 109
Published Date: 07/01/2015
UK Business Procedure/Transmission Procedures - Numbering and Nomenclature of HV Apparatus
$55.2
NG UKBP/TP 109
Published Date: 03/01/2015
UK Business Procedure/Transmission Procedures - Numbering and Nomenclature of HV Apparatus
$55.2
NG UKBP/TP 109
Published Date: 04/01/2011
UK Business Procedure/Transmission Procedures - Numbering and Nomenclature of HV Apparatus
$55.2

Related products

NG CH 16
Published Date: 04/01/2002
Commissioning Handbook - Procedure for Connecting an Additional Circuit Breaker Fail Protection to a Double Busbar Substation with a Common Relay Room
$55.2
NG UKBP/TP 205
Published Date: 04/01/2015
UK Business Procedure/Transmission Procedures - Work Planning Process
$138
NG SCT 01
Published Date: 01/01/2013
Site Commissioning Tests - Requirements for Site Commissioning Tests - On Protection & Control Equipment
$55.2
NG TS 3.08.19
Published Date: 02/01/1994
National Grid Technical Specifications - Plesiochronous Digital Hierarchy Optical Line Termination and Multiplexer Equipment
$59.1

Best-Selling Products

PDA PTC PUPSIT 1
Published Date: 02/01/2020
Points to Consider for Risks Associated with Sterilizing Grade Filters and Sterilizing Filtration
$97.5
PDA PTC PUPSIT 2
Published Date: 03/01/2020
Points to Consider for Implementation of Pre-Use Post-Sterilization Integrity Testing (PUPSIT)
$97.5
PDA TR 13-2
Published Date: 11/01/2020
Technical Report No. 13-2 Fundamentals of an Environmental Monitoring Program Annex 1: Environmental Monitoring of Facilities Manufacturing Low Bioburden Products
$97.5
PDA TR 13
Published Date: 06/01/2014
Technical Report 13 Revised, (TR 13) Fundamentals of an Environmental Monitoring Program
$97.5
PDA TR 13
Published Date: 04/22/2022
Technical Report 13 Revised 2022, (TR 13) Fundamentals of an Environmental Monitoring Program
$97.5
PDA TR 14
Published Date: 09/01/2008
PDA Technical Report No. 14 (TR 14) Validation of Column-Based Chromatography Processes for the Purification of Proteins
$97.5