NG TGN(E) 200 PDF

NG TGN(E) 200 PDF

Name:
NG TGN(E) 200 PDF

Published Date:
04/01/2014

Status:
[ Revised ]

Description:

Technical Guidance Notes - Timescales and Techniques for The Rectification of Overhead Line Defects

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
ng-tgn-e-200_2782092

Choose Document Language:
138.00 €
Need Help?

PURPOSE AND SCOPE

This Technical Guidance Note is intended to provide comprehensive advice to Overhead Line field staff on the necessary actions and timescales for the rectification of defects and the management of such defects until they are repaired. If the defect outage cannot be secured within the timescales agreed, the document outlines the escalation process to enable the remedial works to take place as a matter of priority.

The document is designed to be comprehensive and cover most everyday scenarios. However, for conductor systems and scenarios outside the scope of this document (such as slipped wedge clamps, GZTACSR ‘GAP' type conductor de-regulation issues and sub-conductor clashing) advice should be sought from Asset Integrity

When equipment is to be kept in service a risk assessment shall be carried out as detailed in TP 139 ‘Management of the safety risks to people from equipment retained in service with an abnormal condition'.


Edition : 6
File Size : 1 file , 430 KB
Number of Pages : 26
Published : 04/01/2014

History

NG TGN(E) 200
Published Date: 05/01/2018
Technical Guidance Notes - Timescales and Techniques for The Rectification of Overhead Line Defects
184.20 €
NG TGN(E) 200
Published Date: 04/01/2014
Technical Guidance Notes - Timescales and Techniques for The Rectification of Overhead Line Defects
138.00 €

Related products

NG CH 01
Published Date: 01/01/2008
Commissioning Handbook - Model format for a Commissioning Programme
55.20 €
NG TS 3.24.03
Published Date: 11/01/2000
National Grid Technical Specifications - Substation Facilities & Functions Common to all Bays
55.20 €
NG TS 3.04.22
Published Date: 08/01/2004
Technical Specifications - Overhead Line Pre-Sanction Engineering
55.20 €
NG SCT 20.09
Published Date: 04/01/2000
Site Commissioning Tests - Busbar Protection (High Impedance, Differential Current Balance)
55.20 €

Best-Selling Products

CI/CHLOR IB/A
Published Date: 05/01/2023
Instruction Booklet: CHLORINE INSTITUTE EMERGENCY KIT “A” FOR 100-LB. & 150-LB. CHLORINE CYLINDERS
CI/CHLOR IB/A
Published Date: 07/01/2014
INSTRUCTION BOOKLET: CHLORINE INSTITUTE EMERGENCY KIT “A” FOR 100 LB. & 150 LB. CHLORINE CYLINDERS
CI/CHLOR IB/A
Published Date: 01/01/2021
Instruction Booklet: Chlorine Institute Emergency Kit "A" For 100LB. & 150 LB. Chlorine Cylinders
12.00 €
CI/CHLOR IB/A
Published Date: 01/01/2013
INSTRUCTION BOOKLET: CHLORINE INSTITUTE EMERGENCY KIT “A” FOR 100 LB. & 150 LB. CHLORINE CYLINDERS
CI/CHLOR IB/B
Published Date: 12/01/2013
INSTRUCTION BOOKLET: CHLORINE INSTITUTE EMERGENCY KIT “B” FOR CHLORINE TON CONTAINERS
CI/CHLOR IB/B
Published Date: 07/01/2014
INSTRUCTION BOOKLET: CHLORINE INSTITUTE EMERGENCY KIT “B” FOR CHLORINE TON CONTAINERS