Description:

Technical Guidance Notes - Timescales and Techniques for The Rectification of Overhead Line Defects

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$184.2
Need Help?

PURPOSE AND SCOPE

This Technical Guidance Note details the maximum timescales until which a repair is carried out to various forms of defect and the severity thereof found on overhead transmission lines and also provides guidance on approved techniques for rectifying those defects.

The document is designed to be comprehensive and cover most everyday scenarios. However, for defects that are identified which do not fall into any category contained within, please contact Asset Integrity (OHL’s & Cables team) in order for specific guidance to be given.

The document assumes that the methods used in order to access and ultimately enact the repair techniques are approved and signed off by the relevant National Grid business unit or external companies. It also assumes that the persons carrying out the work are suitably authorised and trained in those access methods and ultimately overhead line maintenance techniques.

If the defects detailed within this document cannot be rectified within the assigned timescale associated with those defects, an Asset Integrity OHL Engineer (OHL’s & Cables team) shall be notified a minimum of 14 days prior to the ‘overdue’ date in order to carry out a risk assessment.

In the majority of cases, the assessment of the severity of the defect and ultimately the assignment of a suitable fix period (timescale) in accordance with this document will be carried out by ETO Operations Support (OHL’s) in accordance with AMBP 238 ‘OHL Defect Management’.


Edition : 7
File Size : 1 file , 340 KB
Number of Pages : 37
Published : 05/01/2018

History

NG TGN(E) 200
Published Date: 05/01/2018
Technical Guidance Notes - Timescales and Techniques for The Rectification of Overhead Line Defects
$184.2
NG TGN(E) 200
Published Date: 04/01/2014
Technical Guidance Notes - Timescales and Techniques for The Rectification of Overhead Line Defects
$138

Related products

NG SCT 16.05
Published Date: 06/01/1998
Site Commissioning Tests - Commissioning Schedule for System Monitoring Equipment (SME) Supplied by Hathaway Power Instrumentation Ltd
$55.2
NG TS 3.09.04
Published Date: 09/01/1992
Technical Specifications (NGTS) - Metering Voltage Failure Alarm Relays (MVFAs)
$55.2
NG DH 23
Published Date: 05/05/2015
Design Handbook - Guidance on Application of Operational Tripping Schemes
$55.2
NG UKBP/TP 215
Published Date: 07/01/2016
UK Business Procedure/Transmission Procedures - Electricity Investment Process – Environmental compliance and Sustainability
$138

Best-Selling Products

prNS 2964
Published Date: 10/24/2000
Plastics pipes - Pipes and fittings with structured wall of polyethylene (PE) for underground non-pressure systems for drainage and sewerage
prNS 2965
Published Date: 10/24/2000
Plastics pipes - Pipes and fittings with structured wall of polypropylene (PP) for underground non-pressure systems for drainage and sewerage
prNS 2966
Published Date: 10/24/2000
Plastics pipes - Pipes and fittings with structured wall of unplasticised poly(vinyl chloride) (PVC-U) for underground non-pressure systems for drainage and sewerage
prNS 2967
Published Date: 06/01/2001
Cable ducts of plastics with smooth solid wall pipe
prNS 2970
Published Date: 09/06/2004
Solid Wall cable ducting of thermoplastics for embedding
prNS 3563
Published Date: 07/01/2002
Ventilation for buildings - Design methodes for indoor climate