Name:
NG TR(E) 434 PDF
Published Date:
06/01/2006
Status:
[ Active ]
Publisher:
National Grid
PURPOSE AND SCOPE
PS(T)010 states that when a Numeric Busbar Protection is out of service for unacceptable period of time a contingency plan shall be applied.
UKBP/TP162 details how to implement the above policy.
This report is assessing the risks of adopting a Numeric Protection System standby option as an alternative to other contingencies detailed into UKBP/TP162.
| Edition : | 1 |
| File Size : | 1 file , 90 KB |
| Number of Pages : | 5 |
| Published : | 06/01/2006 |